53
Installation and Servicing
SECTION 3 - SERVICING
53
3.17 SPARK GENERATOR REPLACEMENT
3.18 GAS CONTROL VALVE REPLACEMENT
1. Refer to Sections 3.2 & 3.3.
2. Disconnect the leads from the spark generator.
3. Remove spark generator by pulling forwards
to release the retaining clip, then push back to
release the second retaining clip.
4. Fit the new spark generator and re-assemble in
reverse order ensuring that the the earth lead is
replaced.
5. Check the operation of the boiler. Refer to
Sections 2.24 - 2.27.
1. Refer to Sections 3.2 & 3.3.
2. Remove the gas inlet pipe. Refer to Section 3.4.
3. Unplug the electrical connection.
4. Disconnect the gas service cock, refer to Section 2.23.
5. Remove the 2 securing screws in the underside of the
boiler casing and remove the valve.
6.
Remove brass injector from gas valve outlet and re-fit
into replacement valve.
7. Replace in reverse order ensuring all seals are in good
condition and the assembly is gas sound.
8. Ensure all gas valve connections are gas tight with a
gas soundness check up to the gas control valve.
9. Check the operation of the boiler. Refer to Sections 2.24
- 2.27.
3.19 CONDENSATE TRAP REPLACEMENT
1. Refer to Sections 3.2 & 3.3.
2. Remove the rubber condensate pipe from
the top of the trap.
3. Rotate the trap clockwise to disengage
the trap and lift clear of the outlet
connection.
4.
Replace the trap and refit in reverse order
making sure the trap is engaged with the
outlet connection.
5.
Refill the condensate trap.
6. Check the operation of the boiler. Refer to
Sections 2.24 - 2.27.
2
6
SER
VICING
Summary of Contents for VOGUE MAX SYSTEM 15
Page 4: ...4 Installation and Servicing...
Page 6: ...6 Installation and Servicing...
Page 68: ...68 SHORT LIST OF PARTS Installation and Servicing...
Page 74: ...74 Installation and Servicing NOTES...
Page 75: ...75 Installation and Servicing NOTES...
Page 76: ...76 Installation and Servicing NOTES...
Page 77: ...77 Installation and Servicing NOTES...
Page 78: ...78 Installation and Servicing NOTES...