29
Installation and Servicing
SECTION 2 - INSTALLATION
2.15 CONNECTIONS & FILLING
FILLING
IMPORTANT
- when filling:
A.
Ensure the dust cap on air vent located at the rear of the
pump chamber is slightly unscrewed.
B.
When filling, there may be a slight water leak from the air
vent therefore electrical connections should be protected.
1. Ensure that the CH isolating valve handles are open.
2.
Fill and vent the system. Refer to Section 2.15 for filling
and setting pressure procedure.
3.
Check for water soundness.
NOTES.
Ensure all boss blanking plugs are removed before connecting hardware. Each
valve must be fitted to the correct boss as shown in the picture.
Ensure each union is fitted with fibre seals provided.
Do not subject any of the isolating valves to heat as the seals may be damaged.
WATER CONNECTIONS CH
1.
Connect the CH flow service valve and copper tail
provided in the hardware pack to the threaded boss
connection provided at the lower rear of the boiler.
2.
Connect the CH return valve (black handle) and copper tail.
3.
If connecting the boiler to heating loads in excess of
17.6kW, connecting flow and return heating systems
pipework must be sized in 28mm diameter at the point
of pipe connection to the boiler tails. use 22mm x 28mm
pipe adaptors as appropriate.
IMPORTANT.
Be sure to follow the Ideal system filter installation and
maintenance guide for correct method of installation.
Failure to install the system filter correctly will affect boiler
warranty.
GAS CONNECTION
IMPORTANT.
The gas service cock is sealed with a non-
metallic blue fibre washer, which must not be overheated when
making capillary connections. Refer to Section 1.16 for details of
the position of the gas connection.
For additional gas supply info refer to Section 1.8.
PRESSURE RELIEF VALVE DRAIN
The pressure relief valve connection, located at the bottom right-
hand side of the boiler, comprises a 15mm diameter stub pipe.
The Installer is to provide a compression joint on the end of the
stub pipe. This assists with pipe removal when servicing.
The discharge pipe should be positioned so that the discharge
of water or steam cannot create a hazard to the occupants of
the premises or damage the electrical components and wiring.
3G9705
Pressure relief valve
Drain Connection
15mm elbow
or fittings
(not supplied)
Pressure relief valve
Drain Pipe
A purpose made pressure relief valve drain
pipe is provided with the boiler to allow safe
discharge through a wall to the outside of
the building. This is particularly relevant to
‘high rise’ installations but can be used for all
installations.
Black
Handle
Black
Handle
Yellow
Handle
CH Flow
Gas
Supply
CH
Return
Note that all isolation
handles are shown in
the open position.
INST
ALLA
TION
Summary of Contents for VOGUE MAX SYSTEM 15
Page 4: ...4 Installation and Servicing...
Page 6: ...6 Installation and Servicing...
Page 68: ...68 SHORT LIST OF PARTS Installation and Servicing...
Page 74: ...74 Installation and Servicing NOTES...
Page 75: ...75 Installation and Servicing NOTES...
Page 76: ...76 Installation and Servicing NOTES...
Page 77: ...77 Installation and Servicing NOTES...
Page 78: ...78 Installation and Servicing NOTES...