3
icos system -
Installation and Servicing
DOCUMENT AMENDMENTS
Relevant Installation changes implemented in this book from Mod Level ........... A10
(Nov 05)
to A11
(Nov 06)
•
Page 9, Table 3 - Balanced Flue Terminal Position
Item no. 1 updated to include above opening.
•
Page 12, Frame 6 - Water Treatment
New contact details for Sentinel Performance Solutions.
•
Page 14, Frame 9 - Unpacking
Hardware Pack - new items C, J & K.
•
Page 18, Frame 15 - Preparing the Wall
Item no. 3, Screw description changed to 14 x 2".
•
Page 20, Frame 21 - Fitting the Piping Frame and Valves
New pictorial image of compression gas cock.
•
Page 23, Frame 25 - Mounting the Boiler
Item no. 6, Fibre washer is now blue not green.
•
Page 24 - Frame 27, Gas Connection
Fibre washer is now blue not green.
New pictorial image of compression gas cock.
•
Page 25 - Frame 29, Water Connections
New pictorial image of compression gas cock.
•
Page 46 - Frame 68, Draining the Boiler
New pictorial image of compression gas cock.
Caradon Ideal Limited reserve the right to vary specification without notice
200214-11.pmd
17/11/2006, 09:35
3