14
INSTALLATION
icos system -
Installation and Servicing
9
UNPACKING
The boiler is supplied fully assembled in one Pack A, together with a standard flue
assembly for lengths up to 650mm, rear or side flue outlet, in Pack B.
Unpack and check the contents.
Pack A Contents
A
Boiler
B
Hardware Pack Box
C
Pre-piping Frame
D
These Installation/Users
Instructions
E
Wall Mounting Template
F
1 Year Guarantee
Pack B Contents
Flue turret.
Flue terminal.
Flue support cutting aid.
Ecl 2
35
4
Flue terminal
Flue turret
nm8
0
2
3
B
C
E
A
D
F
Hardware Pack Contents
A Isolation valve c/w pressure gauge - 1 off
B Isolation valve c/w drain - 1 off
C Compression gas cock - 1 off
D Valve securing clip 22mm - 2 off
E Valve securing clip 15mm - 1 off
F Pre-piping frame support bracket - 1 off
G S-trap hose - 1 off
H 15mm olive - 1 off
I
Pressure relief valve nut - 1 off
J No. 14x2in woodscrew - 4 off
K Wallplug - 4 off
L Fibre washer 19 ID x 26 OD - 3 off
M Gas line sealing washer - 1 off
N Hole plug white - 6 off
P Mains connector - 1 off
nm84
5
8
A
B
C
D
E
F
G
H
I
J
K
L
M
N
P
INST
ALLA
TION
200214-11.pmd
17/11/2006, 09:35
14