12
Buccaneer GTE -
Installation & Servicing
INSTALLATION
12 INSTALLING THE BASE AND DRAIN COCK
2
3
1
4
buc5498
1.
Unscrew the
1
/
2
" plastic plug on the
rear section.
2.
Attach the base onto the feet of the
boiler.
3.
Clip the base onto the rear section.
4.
Screw in the drain cock supplied in
the screw bag making the joint
water tight using hemp or sealing
paste.
5.
Put the boiler body back on
its feet.
13 REVERSE THE DIRECTION OF OPENING OF THE BURNER DOOR IF
NECESSARY (OPENING AT LEFT)
1
2
1
2
buc5500
When the burner leaves the factory, the burner door
opens towards the right. Perform operations in
Frames 13 and Frame 14 to open the burner door
towards the left (if absolutely necessary).
1.
Loosen the 2 top and bottom nuts.
2.
Remove the lower and upper hinges.
INST
ALLA
TION
Summary of Contents for Buccaneer GTE 4