27
Buccaneer GTE -
Installation & Servicing
SERVICING
46 BOILER MAINTENANCE
WARNING
.
The operations described below shall always be
performed with the boiler and the power supply switched off.
The boiler front panel has to be removed to access the various
devices to be maintained and checked.
Proceed as follows:
1.
Lift the control panel cover.
2.
Unscrew the two front panel side attachment screws.
3.
Pull the front panel clear from the clips and the notches in
the top part, pulling it towards you.
4.
Remove the front panel from the notches at the bottom of
the side panels.
Cleaning the Casing Material and Control Cover
Use a soapy solution and sponge only. Rinse with clean
water and dry with chamois leather or soft cloth.
2
4
3
3
2
1
buc5523
47 CLEANING THE FLUEWAYS
1.
Disconnect the burner cable.
2.
Unfasten the four flanged nuts and flat washers using a
13mm spanner and open the burner door.
buc5534
2
2
1
only on 3-section boilers
buc5535
3.
Remove the baffle plates if necessary (variable number
depending on the boiler model).
4.
Carefully sweep the flueways with the brush supplied for
this purpose.
5.
Also brush out the combustion chamber.
6.
Vacuum the soot from beneath the flue ways and in the
burner with the vacuum cleaner with a tube diameter less
than 40mm.
7.
Replace the baffle plates .
8.
Close the door and replace front panel.
SER
VICING