![Ideal Boilers BOXER C 24 Installation And Servicing Manual Download Page 23](http://html.mh-extra.com/html/ideal-boilers/boxer-c-24/boxer-c-24_installation-and-servicing-manual_616911023.webp)
23
BOXER
combination boiler -
Installation and Servicing
INSTALLATION
32 FUNCTIONAL FLOW WIRING DIAGRAM
WARNING.
Whilst effecting the required gas soundness test and purging air from the gas installation,
open all windows and doors, extinguish naked lights and
DO NOT SMOKE.
A. Electrical Installation
1.
Checks to ensure electrical safety should be carried out by
a competent person.
2.
ALWAYS carry out the preliminary electrical system checks,
i.e. earth continuity, polarity, resistance to earth and short
circuit, using a suitable test meter.
B. Gas Installation
1.
The whole of the gas installation, including the meter,
should be inspected and tested for soundness and purged
in accordance with the recommendations of BS. 6891.
2.
Purge air from the gas installation by approved methods
only.
3.
Retighten the union and test for gas soundness.
33 COMMISSIONING AND TESTING
EU E
EU
Y
E
Y
EN
RU
Z
E
EU
EU
Z
Z
EU
EU
Z
E
Z
EU
E
Z
JU
U
0DLQVVXSSO\
9+]
\J
EU
E
\J
\J
*DV
YDOYH
,JQLWLRQ
WUDQVIRUPHU
3XPS
\J
)DQ
$LUSUHVVXUH
VZLWFK
\J
2YHUKHDWWKHUPRVWDW
5HVHW
EXWWRQ
&+VHQVRU
/RZVZLWFK
'+:VHQVRU
)ORZVZLWFK
U
U
Z Z
\J
EN EN
5RRP·VWDW
3URJUDPPHU
5(6(7
(17(5
2))
21
RU
Z
J\
EN U
LEGEND
b
- blue.
bk
- black.
br
- brown.
r
- red.
w
- white.
y/g
- yellow/green.
INST
ALLA
TION
gr
- green.
or
- orange.
v
- violet.
gy
- grey.