13
BOXER
combination boiler -
Installation and Servicing
INSTALLATION
FLUE KITS
Pack B
- supplied as standard
Pack D
- optional extension kit for side flue
or rear flue outlet.
Refer to 'Flue Extension Ducts'
11 CASING REMOVAL
IMPORTANT.
The boiler MUST be installed
in a vertical position
Dimension X - Wall thickness.
Dimension L - Wall thickness plus boiler spacing.
Dimension S - Upward routing pipework frame depth = 50 mm
1.
Undo the upper front retaining screw (A).
2.
Undo the LH and RH side nuts retaining the plastic
fascia board (B) and remove.
3.
Release the four fixing clamps on the upper and lower
positions (2 + 2) (C).
4.
Lift and remove casing (D).
5.
Place to one side the removed casing to avoid damage.
12 DETERMINING THE FLUE LENGTH AND FLUE PACKS REQUIRED
Notes.
1.
The flue duct MUST be inclined at 1.5 degrees to the
horizontal to not allow the rain come into the boiler.
2.
If the boiler is to be installed with upward piping routed
behind the boiler then the optional stand-off kit should be
used. Care must be taken when cutting the ducts and
marking wall to suit this condition.
3.
If no extenction ducts are required, the flue restrictor must
be fitted.
Note.
For flue options refer
to page 5.
Total Flue length dimension
Flue
Rear flue
Side flue
Extra packs
dim. X+185
dim. L+225
required
Up to 720
Up to 720
none
Up to 1685
Up to 1685
Pack D 1 - off
Up to 2650
Up to 2650
Pack D 2 - off
185 + S = 235 mm
185 mm
Rear flue length X
225 mm 225 mm
Side flue length L
See also frame 16 and 17
A
B
C
C
D
D