18
BOXER
combination boiler -
Installation and Servicing
INSTALLATION
FLUE OUTLET
1.
Fit the inner flue extension duct onto the inner flue duct.
2.
Fit the outer flue extension duct onto the outer air duct.
3.
Using the clamp provided clamp the flue lengths together.
4.
Repeat steps 1-3 if a second flue extension is required.
5.
Measure and mark the flue length required onto the flue,
measuring from the groove near the terminal.
6.
To ensure a square cut, mark the flue all the way round.
7.
Cut to length at the right size the external duct and cut the
internal one 20 mm longer.
8.
De-burr the metal edges.
22 FITTING THE KIT
General Notes
1.
Fitting the Piping Frame, top entry pipework is an option, as
well as mounting from the bottom or through the wall.
If pipes are run vertically within the boiler back space
provided by optional stand-off frame positions they must
avoid any obstructions imposed by the channels and by a
rear facing flue, should this position be selected.
23 SERVICE CONNECTIONS
2.
Horizontal connecting pipes, where used, must be run
outside the limits of the boiler casing.
0HD
VXUH
*5229(
PP
FLUE OUTLET