3
GENERAL
Mexico Super 4100 FF & 4125 FF -
Installation
NOTE TO THE INSTALLER: LEAVE THESE
INSTRUCTIONS ADJACENT TO THE GAS METER.
ALSO COMPLETE THE BENCHMARK LOG BOOK
AND GIVE THIS TO THE CUSTOMER.
CONTENTS
Air Supply. ............................................................................. 6
Boiler Assembly - Exploded view ....................................... 8
Boiler Clearances ................................................................ 5
Burner Assembly - Exploded view ................................... 42
Electrical Connections ...................................................... 23
Electrical Diagrams .................................................. 23 & 24
Electrical Supply .................................................................. 7
Extension Ducts - Fitting .................................................... 20
Fault Finding ........................................................................ 37
Flue Fitting ..................................................................... 11-20
Flue Installation .................................................................... 6
Gas Safety Regulations ....................................................... 4
Gas Supply ............................................................................ 6
Initial Lighting ..................................................................... 27
Installation ............................................................................ 8
Mandatory Requirements ................................................ 4-5
Pump ................................................................................... 22
Servicing ............................................................................. 29
Short List of Parts .............................................................. 38
System Diagrams (Electrical) ........................................... 25
Terminal Guards. .................................................................. 6
Water Circulation ................................................................. 7
Water Connections ..................................................... 4 & 21
Water Systems .................................................................. 22
Water Treatment .................................................................. 7
Mexico Super FF
B.G. Certified - P.I. No. 87AU83
Destination Countries: GB & IE
Appliance type: C
12
Models
G.C. Appliance No.
Mexico Super 4100 FF ................... 41 392 31
Mexico Super 4125 FF ................... 41 392 32
Natural Gas only
BENCHMARK LOG BOOK DETAILS
B
oiler
Page
Make and model ....................................................... 3
Appliance serial no. on data badge ......................... 8
SEDBUK No. % ......................................................... 2
Controls
Time and temperature control to heating ............. 25
Time and temperature control to hot water .......... 25
Heating zone valves .............................................. 25
TRV's ......................................................................... 7
Auto bypass .............................................................. 7
Boiler interlock .......................................................... 7
For all boilers
Flushing to BS.7593 ................................................. 7
Inhibitor ..................................................................... 7
Central heating mode
Heat input ................................................ to be calculated
For assistance see Technical Helpline on the back page
Page
Burner operating pressure ...... measure and record
Central heating flow temp. ...... measure and record
Central heating return temp. ... measure and record
For combination boilers only
Scale reducer ......................................................... n/a
Hot water mode
Heat input ............................................................... n/a
Max. operating burner pressure ............................ n/a
Max. operating water pressure ............................. n/a
Cold water inlet temp ............................................ n/a
Hot water outlet temp. ........................................... n/a
Water flow rate at max. setting .............................. n/a
For condensing boilers only
Condensate drain .................................................. n/a
For all boilers:
complete, sign & hand over to customer
For GB, to comply with Building Regulations Part L1 (Part J in Scotland) the boiler should be fitted in accordance with the
manufacturer's instructions. Self-certification that the boiler has been installed to comply with Building Regulations can be
demonstrated by completing and signing the Benchmark log book.