15
INSTALLATION
SIDE FLUE OUTLET
Mexico Super 4100 FF & 4125 FF -
Installation
20 FITTING BOILER SEALING RING TO THE FLUE
19 CUTTING THE FLUE - wall thicknesses of 114 to 600mm
1. Measure and note the wall thickness X.
2. Mark the wall thickness onto the flue.
3. To ensure the tube is cut square, mark the flue all the
way round.
4. Cut to length X, using the cardboard ring for support.
5. Remove cardboard ring and remove any burrs.
1. To determine the position for the foam seal
measure the wall thickness and mark it onto
the flue, measuring from the groove near the
terminal.
2. Wrap the self-adhesive foam strip round the
flue, ensuring that the foam is on the terminal
side of the line. This seals the gap between
the flue and the wall.
21 FITTING THE FOAM SEAL
1. Fit the boiler sealing ring inside the outer flue duct.
Ensure the boiler sealing ring is fully engaged.
Ensure the notch aligns with the groove on the outer flue
duct. This ensures correct alignment of the flue terminal.
2. Drill 3 holes 3.2mm (
1/8
") dia. through the outer flue duct
and boiler sealing ring.
Do not drill the inner flue duct
.
3. Insert the self tapping screws, provided, in order to fix
the boiler sealing ring in position.