19
INSTALLATION
T
OP FLUE OUTLET
Mexico Super 4100 FF & 4125 FF -
Installation
31 FITTING THE FLUE ASSEMBLY
Inside fitting.
1. Insert the flue assembly through the hole far enough to
allow the rubber seal to unfold completely and form an
adequate seal on the outside wall.
2. Ensure the notch is at the top.
32 FITTING THE SIDE OUTLET PLATES
Note.
If the boiler is fitted closer than 25mm to the side wall
the side outlet plate must be fitted now.
1. Split the side outlet plate into 2 down the split line.
2. Fit the 2 halves of the side outlet plate to the wall,
ensuring they are behind the boiler sealing ring.
33 LOCATING THE BOILER
Position the boiler beneath the flue assembly.
1. Connect the flue terminal to the boiler,
using the length (A) of flue duct
previously cut and ensuring that the
inner flue locates into the short
extension tube.
2. Secure the flue to the boiler using the 2
M4 x 16mm screws previously
removed.
34 CONNECTING THE FLUE TO THE BOILER