11. PLANNED MAINTENANCE
Performing the following inspections can prevent many issues. Be sure to turn off the water supply
before servicing the system and be sure that replacement parts have been installed according to
supplied drawing specifications.
Refer to
A
PPENDIX
A
–
I
DENTIFYING
&
A
NALYZING
P
ROBLEMS
, for any problems encountered.
D
AILY
:
•
Clean machine after use (
See
S
ECTION
10,
E
XTERIOR
C
LEANUP
for details)
•
Check and monitor service pressures and temperatures prior to and during operation per operations manual
•
Monitor pH levels of detergents (
See
S
ECTION
9,
S
TEP
16
for details)
•
Check the keg couplers, spear adaptor, and locking mechanism in the handle for damage. Damage may be
transferred to the keg valve seal; Change damaged parts as necessary.
W
EEKLY
:
•
Check head seal connections and “O” rings for wear and damage. Replace as necessary
•
Check for leaks on all service lines and unions. Replace seals and/or tighten as necessary
•
Check for loose hardware. Tighten as necessary
•
Check for loose wire terminations. Tighten as necessary
M
ONTHLY
:
•
Check dosing units for accuracy and operation in line with operations manual recommendations. Adjust if
necessary
•
Check Infrared Liquid Sensor for cleanliness and good operation by removing from pipework and verify
sensor tip is clean and polished. Clean and/or replace if necessary
•
Clean out all airline filters and drain any condensate
•
Check all push-button switches and indicator lamps for damage. Replace as necessary
•
Check all spare parts inventory levels. Replace as necessary.
(See
A
PPENDIX
C
–S
PARE
P
ARTS
)
Q
UARTERLY
:
•
Check pressure gauges for accuracy. Adjust and/or replace if necessary
•
Check the transfer system alignment and keg placement over the connection heads. Lubricate, make
adjustments, and replace worn parts as necessary
•
Check all hoses for leaks and/or wear. Replace as necessary
•
Check tri-clover seals for wear and/or damage. Replace as necessary
•
Check all electrical power connections and motor overload settings. Reset if necessary
•
Check pumps for leaks
Y
EARLY
:
•
Check process valve, seats, “O” rings, and seals for wear and damage. Replace as necessary
•
Inspect pump seals for wear or damage. Replace as necessary
•
Inspect all air cylinder seals for wear and/or damage. Replace as necessary
•
Check nylon air lines for leaks and continued flexibility. Replace as necessary
•
Check all solenoid valves for proper operation. Replace if necessary
Back To TOC
Summary of Contents for SQUIRE PLUS 2
Page 47: ...SQUIRE PLUS 2 OPERATIONS MANUAL PROCESS PACKAGING INC PAGE 47 OF 125 www iddeas com ...
Page 48: ...SQUIRE PLUS 2 OPERATIONS MANUAL PROCESS PACKAGING INC PAGE 48 OF 125 www iddeas com ...
Page 49: ...SQUIRE PLUS 2 OPERATIONS MANUAL PROCESS PACKAGING INC PAGE 49 OF 125 www iddeas com ...
Page 50: ...SQUIRE PLUS 2 OPERATIONS MANUAL PROCESS PACKAGING INC PAGE 50 OF 125 www iddeas com ...
Page 70: ...SQUIRE PLUS 2 OPERATIONS MANUAL PROCESS PACKAGING INC PAGE 70 OF 125 www iddeas com ...
Page 71: ...SQUIRE PLUS 2 OPERATIONS MANUAL PROCESS PACKAGING INC PAGE 71 OF 125 www iddeas com ...
Page 72: ...SQUIRE PLUS 2 OPERATIONS MANUAL PROCESS PACKAGING INC PAGE 72 OF 125 www iddeas com ...
Page 73: ...SQUIRE PLUS 2 OPERATIONS MANUAL PROCESS PACKAGING INC PAGE 73 OF 125 www iddeas com ...
Page 74: ...SQUIRE PLUS 2 OPERATIONS MANUAL PROCESS PACKAGING INC PAGE 74 OF 125 www iddeas com ...
Page 75: ...SQUIRE PLUS 2 OPERATIONS MANUAL PROCESS PACKAGING INC PAGE 75 OF 125 www iddeas com ...
Page 78: ...SQUIRE PLUS 2 OPERATIONS MANUAL PROCESS PACKAGING INC PAGE 78 OF 125 www iddeas com ...
Page 79: ...SQUIRE PLUS 2 OPERATIONS MANUAL PROCESS PACKAGING INC PAGE 79 OF 125 www iddeas com ...
Page 80: ...SQUIRE PLUS 2 OPERATIONS MANUAL PROCESS PACKAGING INC PAGE 80 OF 125 www iddeas com ...
Page 81: ...SQUIRE PLUS 2 OPERATIONS MANUAL PROCESS PACKAGING INC PAGE 81 OF 125 www iddeas com ...
Page 82: ...SQUIRE PLUS 2 OPERATIONS MANUAL PROCESS PACKAGING INC PAGE 82 OF 125 www iddeas com ...
Page 83: ...SQUIRE PLUS 2 OPERATIONS MANUAL PROCESS PACKAGING INC PAGE 83 OF 125 www iddeas com ...
Page 84: ...SQUIRE PLUS 2 OPERATIONS MANUAL PROCESS PACKAGING INC PAGE 84 OF 125 www iddeas com ...
Page 85: ...SQUIRE PLUS 2 OPERATIONS MANUAL PROCESS PACKAGING INC PAGE 85 OF 125 www iddeas com ...
Page 86: ...SQUIRE PLUS 2 OPERATIONS MANUAL PROCESS PACKAGING INC PAGE 86 OF 125 www iddeas com ...
Page 87: ...SQUIRE PLUS 2 OPERATIONS MANUAL PROCESS PACKAGING INC PAGE 87 OF 125 www iddeas com ...
Page 88: ...SQUIRE PLUS 2 OPERATIONS MANUAL PROCESS PACKAGING INC PAGE 88 OF 125 www iddeas com ...
Page 89: ...SQUIRE PLUS 2 OPERATIONS MANUAL PROCESS PACKAGING INC PAGE 89 OF 125 www iddeas com ...
Page 90: ...SQUIRE PLUS 2 OPERATIONS MANUAL PROCESS PACKAGING INC PAGE 90 OF 125 www iddeas com ...
Page 91: ...SQUIRE PLUS 2 OPERATIONS MANUAL PROCESS PACKAGING INC PAGE 91 OF 125 www iddeas com ...
Page 92: ...SQUIRE PLUS 2 OPERATIONS MANUAL PROCESS PACKAGING INC PAGE 92 OF 125 www iddeas com ...
Page 93: ...SQUIRE PLUS 2 OPERATIONS MANUAL PROCESS PACKAGING INC PAGE 93 OF 125 www iddeas com ...
Page 94: ...SQUIRE PLUS 2 OPERATIONS MANUAL PROCESS PACKAGING INC PAGE 94 OF 125 www iddeas com ...
Page 95: ...SQUIRE PLUS 2 OPERATIONS MANUAL PROCESS PACKAGING INC PAGE 95 OF 125 www iddeas com ...
Page 96: ...SQUIRE PLUS 2 OPERATIONS MANUAL PROCESS PACKAGING INC PAGE 96 OF 125 www iddeas com ...
Page 97: ...SQUIRE PLUS 2 OPERATIONS MANUAL PROCESS PACKAGING INC PAGE 97 OF 125 www iddeas com ...
Page 98: ...SQUIRE PLUS 2 OPERATIONS MANUAL PROCESS PACKAGING INC PAGE 98 OF 125 www iddeas com ...
Page 99: ...SQUIRE PLUS 2 OPERATIONS MANUAL PROCESS PACKAGING INC PAGE 99 OF 125 www iddeas com ...
Page 100: ...SQUIRE PLUS 2 OPERATIONS MANUAL PROCESS PACKAGING INC PAGE 100 OF 125 www iddeas com ...
Page 101: ...SQUIRE PLUS 2 OPERATIONS MANUAL PROCESS PACKAGING INC PAGE 101 OF 125 www iddeas com ...
Page 102: ...SQUIRE PLUS 2 OPERATIONS MANUAL PROCESS PACKAGING INC PAGE 102 OF 125 www iddeas com ...
Page 103: ...SQUIRE PLUS 2 OPERATIONS MANUAL PROCESS PACKAGING INC PAGE 103 OF 125 www iddeas com ...
Page 104: ...SQUIRE PLUS 2 OPERATIONS MANUAL PROCESS PACKAGING INC PAGE 104 OF 125 www iddeas com ...
Page 105: ...SQUIRE PLUS 2 OPERATIONS MANUAL PROCESS PACKAGING INC PAGE 105 OF 125 www iddeas com ...
Page 106: ...SQUIRE PLUS 2 OPERATIONS MANUAL PROCESS PACKAGING INC PAGE 106 OF 125 www iddeas com ...