Ver. 1.04.19
© 2012 -2019 by ICS
18
Maintenance schedule for IC 022
1.
General visual inspection of housing, welding seams, chassis, wheels, screw joints
2.
Complete exterior and interior cleaning if required
3.
Check the operation of the inlet pressure valve
4.
Filter/regulator combination, replace filter, clean and re-adjust
5.
Check pneumatic control elements, check for leaks and replace sound absorbers
6.
Check compressed air inlet filter, filter cartridge and automatic drain, or renew
7.
Check compressed air cylinder for operation, leaks and tightness
8.
Check complete ice dosing system for wear, operation and leak tightness
9.
Check hopper for operation and leak tightness
10.
Check hose package for wear, operation and leak tightness (perform pressure test)
11.
Check connection elements, connectors and pneumatic couplings for damage, operation
and safety
12.
Check blasting gun for operation and safety
13.
Check existing blasting nozzles for wear and cracks
14.
Pressure test and security test
15.
Operation test
16.
Blasting test
17.
Renew inspection and maintenance plate