17
■ Dasher cover assembly ■
1. Apply edible vegetable oil to the ring inserted
into the piston.
3. Insert the discharge lever into the piston and then
insert the lever in line with the dasher cover and
the discharge lever.
4. Insert the packing dasher to the dasher cover.
5. Insert the mixing shaft and align the dasher bearing.
Mixing shaft
Dasher bearing
6. Fasten the two pairs of dasher cover bolts facing
each other diagonally.
If they are loose, then the soft cream can leak.
Fasten it tightly.
2. Insert the piston in the dasher cover.
※Please make sure not to switch the middle
piston with left and the right piston.
※ When reassembling, the (A) part of the middle
piston should be placed as shown in the (Picture 1).
When the Partition Food (rubber packing) is inserted fully,
please turn the piston to look forehand as shown in the
(Picture 2). (Prevention of the rubber from getting entangled)
(Picture 1)
(Picture 2)
A
(Partition food)
Summary of Contents for ISI-163SB
Page 3: ...3 Cautions for your safety...
Page 4: ...4 30...
Page 5: ...5...
Page 21: ...21 Circuit diagram...
Page 24: ...24 Part list MOVE PART...
Page 25: ...25 Part list DASHER ASSY...
Page 26: ...26 Part list COMPRESSOR AND CONDENSER...
Page 27: ...27 Part list FRONT COVER ASS Y SIDE BACK PANEL ASS Y...
Page 30: ...MEMO 30...
Page 31: ...MEMO 31...
Page 32: ...3240350 00 Online Internet Service http www icetro com...