STEP 58: NETWORK CABLE FLOW
The Network cable run starts from front of game to first coupler at the back. The other side of the
coupler goes up the left score tower and back down into another coupler. Each tower has two
network cables. Each coupler and cable is colored coded.
Either one can be used for input or output.
DO NOT PLUG BOTH CABLES FROM A TOWER INTO THE SAME COUPLER!
Two pin DC power cables are also at each
tower connection
Connect the display harness coming
from the center tower.
Direction of network.
Not physical connections.
Any cable with the same color can be plugged into same color coupler.
Summary of Contents for DODGEBALL ULTIMATE ARENA
Page 7: ...7 Assembly for Steps 1 8 Chapter 1 ...
Page 16: ...16 Assembly for Steps 9 16 Chapter 2 ...
Page 22: ...22 Assembly for Steps 17 22 Chapter 3 ...
Page 28: ...28 Assembly for Steps 23 26 Chapter 4 ...
Page 33: ...33 Assembly for Steps 27 43 Chapter 5 ...
Page 43: ...43 Assembly for Steps 44 51 Chapter 6 ...
Page 48: ...48 Assembly for Steps 52 59 Chapter 7 ...
Page 53: ...53 STEP 57 Tower harnesses Insert cables from each tower assembly into the bottom holes B ...
Page 75: ...75 Tower Covers Part Numbers ...
Page 76: ...76 DECAL PART NUMBERS ...
Page 82: ...82 DB3277X ball gate Assembly NS1022 P802 black NS1022 P509 blue ZS2015X Actuator ...