36
STEP 29:
DO NOT TIGHTEN HARDWARE
Loosely secure the cage bottom to the cabinet using five PC60622 black Allen bolts and AA6212
black washers from the inside of the cabinet.
STEP 30:
Slide the top 1Q left cage panel onto the 2G left cage top, yellow to the inside.
1Q
AA6212 1/4 X 3/4 FLAT
WASHER BLACK
PC60622 1/4-20 X
1 (BLACK)
X’s 5
Inside
Summary of Contents for DODGEBALL ULTIMATE ARENA
Page 7: ...7 Assembly for Steps 1 8 Chapter 1 ...
Page 16: ...16 Assembly for Steps 9 16 Chapter 2 ...
Page 22: ...22 Assembly for Steps 17 22 Chapter 3 ...
Page 28: ...28 Assembly for Steps 23 26 Chapter 4 ...
Page 33: ...33 Assembly for Steps 27 43 Chapter 5 ...
Page 43: ...43 Assembly for Steps 44 51 Chapter 6 ...
Page 48: ...48 Assembly for Steps 52 59 Chapter 7 ...
Page 53: ...53 STEP 57 Tower harnesses Insert cables from each tower assembly into the bottom holes B ...
Page 75: ...75 Tower Covers Part Numbers ...
Page 76: ...76 DECAL PART NUMBERS ...
Page 82: ...82 DB3277X ball gate Assembly NS1022 P802 black NS1022 P509 blue ZS2015X Actuator ...