background image

 22

 

Assembly for Steps 17-22. 

Chapter 3 

Summary of Contents for DODGEBALL ULTIMATE ARENA

Page 1: ...DB1200X Service Manual Innovative Concepts in Entertainment 10123 Main Street Clarence New York 14031 716 759 0360 8 30am to 6 00pm EST WWW ICEGAME COM ...

Page 2: ...9 61 66 UCL connection 67 Locations for Program Settings Diagnostics Volume Power controls 68 Entering Program Settings or Accounting Mode 69 Options defined 70 Diagnostics and Trouble shooting Guide 71 72 Target PCB ID Numbers 73 Target PCB Dip Switch Settings 74 Target Graphic part numbers 75 Graphic decal part numbers 76 Leader Board Assembly and Parts 77 78 Blocker arm and motor removal 79 But...

Page 3: ...GE CONVERSION INFORMATION WARNING DO NOT remove any of the components on the main board e g compact flash and eproms while the game is powered on This may cause permanent damage to the parts and the main board Removing any main board component part while powered on will void the warranty ALWAYS REMOVE POWER TO THE GAME BEFORE ATTEMPTING ANY SERVICE UNLESS NEEDED FOR SPECIFIC TESTING FAILURE TO OBS...

Page 4: ...and Comp LED button J6 has right LED button and left LED button connections Both DB2135X boards blue left and red right have the operator controls to program see audits enter diagnostics or reset settings PROG SEL UP and DOWN buttons are used at blue side left The player buttons are also used during Diagnostic audits and reset menus The jumbotron display is driven by WH2236X board This board conta...

Page 5: ... 1 2 BLACK AA6966 1 4 20 nylock black nut AA6281 1 4 20 X 1 1 2 BLACK AA6030 8 1 1 4 black drywall screw AA6177 8 32 x 1 pan head silver AA6514 8 1 2 pan head silver PC60614 1 4 20 Kept Nut AA6630 1 4 20 x 4 black Allen HARDWARE LIST AA0655 8 X 3 4 Square pan head screw AA6004 8 32 X 1 2 AA6883 10 X 1 1 2 Silver TORX AA6516 1 4 20 X 3 4 DOWEL NUT silver E08639 HARNESS CLAMP QTY 3 ...

Page 6: ...d balls in each box 18 balls installed in game and 6 spare balls NON HARDWARE ITEMS INCLUDED WITH PARTS PACK GLASS CLEAN PC60601A 5 32 Allen wrench AA6173 2 Phillips BIT AA6811 T 20 Torx Bit AA6215 5 32 Security Allen Bit PC60615A 2 SQ DRIVE BIT CG2027 9 AC POWER CORD ...

Page 7: ...7 Assembly for Steps 1 8 Chapter 1 ...

Page 8: ... Loose 1F Pallet 2 Bundle 2 2v 2W Pallet 1 loose 1G Pallet 1 loose 1H Pallet 1 Bundle 1 1P X s4 Pallet 2 loose 2k AA6966 1 4 20 black nylon nut QTY 4 AA6125 1 4 20 X 2 1 2 black Allen QTY 26 AA6212 1 4 X 3 4 black washer QTY 30 HARDWARE NEEDED ...

Page 9: ...ted at the back STEP 1 Attach two 1P leg to the left wall 1G panel graphics facing up using three AA6125 Allen bolts and three AA6212 black flat washers on each 1P leg The legs should be on top of the outside of the panel Graphics should be on facing at you Db3179 DB3007 should be facing ground 1P 1G 1P ...

Page 10: ...s and three AA6212 black flat washers on each leg The 1P legs should be on top of the outside of the panel Graphics should be on facing at you Db3179 DB3007 should be facing ground AA6125 1 4 20 X 2 1 2 Black AA6212 1 4 X 3 4 black washer X s 6 LEGS mount ON TOP Two slots are created at the back 1P 1P 1H ...

Page 11: ...g three AA6584 black Allen bolts and AA6212 black washers Brackets when installed should be on the inside of the panel See mounted brackets and pay attention to the Square cut out on the right side 2W 2V Back panel assembled X s 6 Make sure square cutout is to the right when installing brackets Brackets go on the inside of the panel when mounted ...

Page 12: ...he left wall back slots you created when you installed the back legs STEP 5 Secure the back wall to the left side wall assembly using two AA6125 and two AA6212 black flat washers AA6125 1 4 20 X 2 1 2 BLACK AA6212 1 4 X 3 4 FLAT WASHER BLACK X s 2 ...

Page 13: ... washer STEP 6 Insert the other side of the back wall assembly into the right wall slots AA6125 1 4 20 X 2 1 2 BLACK Secure the back wall to the right wall assemblies using three AA6125 and three AA6212 black flat washers X s 2 ...

Page 14: ...14 STEP 7 Slide two 1S Joists into the two inner channels shown NO HARDWARE is used to secure them ...

Page 15: ...t using two AA6125 Allen bolts and AA6212 washers from the backside and secure them with AA6966 nylon nuts at the front TIGHTEN ALL HARDWARE ONLY WHEN ALL BOLTS ARE INSTALLED AA6966 1 4 20 black nylon nut QTY 4 AA6125 1 4 20 X 2 1 2 black Allen QTY 4 AA6212 1 4 X 3 4 black washer QTY 8 Completed ...

Page 16: ...16 Assembly for Steps 9 16 Chapter 2 ...

Page 17: ...Parts Needed Pallet 2 loose 2E Pallet 1 loose 1O Pallet 1 loose 1E Pallet 1 loose 1I Pallet 1 loose 1J Pallet 1 loose 1k QTY 18 AA6212 1 4 X 3 4 black washer QTY 18 AA6584 1 4 20 X 2 BLACK HARDWARE NEEDED ...

Page 18: ... X 3 4 black washer STEP 10 Secure the power sub floor 1E using two AA6584 black Allen bolts and AA6212 black washers NOTE Although all efforts we made to ensure quality in parts before installing this panel inspect the panel for damage to wiring or mounting holes not fully cleaned out X s 2 AA6584 1 4 20 X 2 black Allen ...

Page 19: ... 1J 1I 2E Ball gate assembly AA6212 1 4 X 3 4 black washer AA6584 AA6212 AA6584 1 4 20 X 2 BLACK X s 6 STEP 12 Secure both left 1I and right 1J ball deflectors to the 2E ball gate assembly using three AA6584 black Allen bolts and AA6212 black washers on each deflector Hardware comes from the bottom through the floor into the deflectors 1I 1J 2E ...

Page 20: ... washers from the top and at the back of the support STEP 14 Slide the 2E ball gate assembly into the front slot of the base cabinet Watch your fingers DO NOT SECURE AT THIS TIME X s 4 NOTE Although all efforts we made to ensure quality in parts before installing this panel inspect the panel for damage to wiring or mounting holes not fully cleaned out 1K ...

Page 21: ...y in parts before installing this panel inspect the panel for damage to wiring or mounting holes not fully cleaned out X s 4 AA6584 1 4 20 X 2 black Allen AA6212 1 4 X 3 4 black washer STEP 16 Secure the 2E ball gate with two AA6584 black Allen bolts and AA6212 black washers shown with arrows This is to finish securing from Step 18 X s 2 AA6584 1 4 20 X 2 black Allen Base Assembled 1O ...

Page 22: ...22 Assembly for Steps 17 22 Chapter 3 ...

Page 23: ...llet 2 loose 2C Pallet 2 loose 2D Pallet 2 loose 2A Pallet 2 loose 2B Pallet 2 bundle 1 2M Pallet 2 bundle 1 2N QTY 14 AA6212 1 4 X 3 4 black washer QTY 14 AA6584 1 4 20 X 2 BLACK HARDWARE NEEDED QTY 6 AA6004 8 32 X 1 2 ...

Page 24: ...and ensure no damage has been done to the network cable At the bottom of the 2D right tower should be two network cords and two DC connections one small one large Carefully pull them out and ensure no damage has been done to the network cables It might be possible that the network cables can catch on internal wiring inside the towers Wiggle the cable up down back and fourth until it is free ...

Page 25: ... black washers Use the Allen wrench to access the back bolt inside STEP 18 Position 2C target assembly to the left and 2D target assembly to the right at the back of the cabinet Align the hole at the bottom of the towers with the holes already at the back Push ethernet and power cables to the bottom of the game X s 3 ...

Page 26: ...4 8 32 X 1 2 X s 3 STEP 20 Lay the 2A left and 2B right inner towers on their backs Both towers should have one network cord and one DC connection one large Carefully pull them out and ensure no damage has been done to the network cables It might be possible that the network cables can catch on internal wiring inside the towers Wiggle the cable up down back and fourth until it is free 2M or 2N ...

Page 27: ...ole at the bottom of the towers with the holes already at the back STEP 22 Secure each of the inner towers using four AA6584 black Allen bolts and AA6212 black washers Do not install tower covers at this time AA6212 1 4 X 3 4 FLAT WASHER BLACK AA6584 1 4 20 X 2 BLACK X s 4 T Molding goes to the bottom Towers Assembled ...

Page 28: ...28 Assembly for Steps 23 26 Chapter 4 ...

Page 29: ...29 Parts Needed Recommend 3 helpers Two 6 or 8 ladders Pallet 1 loose 1D Pallet 2 bundle 1 2P 2O QTY 4 AA6212 1 4 X 3 4 black washer QTY 4 AA6584 1 4 20 X 2 BLACK HARDWARE NEEDED QTY 6 AA6004 8 32 X 1 2 ...

Page 30: ...SITION SHOULD BE AT THE FRONT INSIDE THE CABINET TO MOUNT HARDWARE AND STABILIZE CENTER TARGET JUMBOTRON ASSEMBLY Lift the 1D jumbotron up and onto the 2A 2B inner score towers There are slots the jumbotron assembly fits into The assembly will not evenly fit between the two inner towers unless it is in aligned to the slots Notch at front at each side Recommend 3 helpers ...

Page 31: ...arget assembly STEP 24 Secure each inner tower to the jumbotron using three AA6584 black Allen bolts and AA6212 black washers STEP 25 From the back of the game connect the power and coms harnesses Then connect one ethernet cable from each center score tower to the center score assembly NETWORK CABLES FROM SCORE TOWERS POWER AND COMS HARNESSES X s 4 ...

Page 32: ...32 STEP 26 On each inner tower and on both sides attach a DB3034 cover using three AA6004 black Allen bolts and AA6212 black washers AA6004 8 32 Jumbotron Installed 2O 2P X s 6 ...

Page 33: ...33 Assembly for Steps 27 43 Chapter 5 ...

Page 34: ...Pallet 2 Loose 2H Pallet 2 Loose 2G HARDWARE NEEDED AA6212 1 4 X 3 4 FLAT WASHER BLACK QTY 30 AA6281 1 4 20 X 1 1 2 black Allen QTY6 AA6966 1 4 20 nylock black nut QTY 4 AA6125 1 4 20 X 2 1 2 black Allen QTY 6 PC60622 1 4 20 X 1 BLACK QTY 16 AA6369 1 4 20 X 3 1 2 BLACK QTY 2 ...

Page 35: ...d against the 2C outer tower AA6212 1 4 X 3 4 FLAT WASHER BLACK PC60622 1 4 20 X 1 BLACK STEP 28 DO NOT TIGHTEN HARDWARE Loosely secure the cage to the 2C outer tower using three PC60622 black Allen bolts and AA6212 black washers from the inside of the cabinet X s 3 ...

Page 36: ... the cabinet using five PC60622 black Allen bolts and AA6212 black washers from the inside of the cabinet STEP 30 Slide the top 1Q left cage panel onto the 2G left cage top yellow to the inside 1Q AA6212 1 4 X 3 4 FLAT WASHER BLACK PC60622 1 4 20 X 1 BLACK X s 5 Inside ...

Page 37: ...AA6212 black washer OUTSIDE AA6212 1 4 X 3 4 FLAT WASHER BLACK AA6369 1 4 20 X 3 1 2 BLACK STEP 32 DO NOT TIGHTEN HARDWARE Secure the cage to 1Q using three AA6281 Black Allen Bolts and AA6212 black washers AA6281 1 4 20 X 1 1 2 black Allen AA6212 1 4 X 3 4 FLAT WASHER BLACK X s 1 X s 3 1Q 2G ...

Page 38: ...e assembly to the 2C left outer tower with one AA6125 black bolt and AA6212 black washer AA6212 1 4 X 3 4 FLAT WASHER BLACK AA6125 1 4 20 X 2 1 2 black Allen STEP 34 Align the 2H right cage against the back tower X s 1 1Q 2C 2H ...

Page 39: ...r using three PC60622 black Allen bolts and AA6212 black washers from the inside of the cabinet STEP 36 DO NOT TIGHTEN HARDWARE Secure the cage bottom to the cabinet using five PC60622 black Allen bolts and AA6212 black washers from the inside of the cabinet X s 3 AA6212 1 4 X 3 4 FLAT WASHER BLACK PC60622 1 4 20 X 1 BLACK X s 5 ...

Page 40: ... filler panel onto the 2H right cage top STEP 38 Secure the cage to the front cabinet legs using one AA6369 Black Allen Bolt and AA6212 black washer OUTSIDE AA6212 1 4 X 3 4 FLAT WASHER BLACK AA6369 1 4 20 X 3 1 2 BLACK X s 1 ...

Page 41: ...hers STEP 40 Secure the cage assembly to the back tower with one AA6125 black bolt and AA6212 black washer AA6212 1 4 X 3 4 FLAT WASHER BLACK AA6125 1 4 20 X 2 1 2 black AA6212 1 4 X 3 4 FLAT WASHER BLACK AA6281 1 4 20 X 1 1 2 BLACK STEP 41 Tighten all hardware for the cages X s 3 X s 1 2H 3J 3J 2D ...

Page 42: ... from the backside and secure them with AA6966 nylon nuts at the front on both sides DO NOT TIGHTEN AT THIS TIME X s 4 AA6212 1 4 X 3 4 black washer AA6966 1 4 20 nylock black nut AA6125 1 4 20 X 2 1 2 black Allen Cages Assembled STEP 42 Slide the back 2K roof arch into the back legs 2K ...

Page 43: ...43 Assembly for Steps 44 51 Chapter 6 ...

Page 44: ... 4A Pallet 2 addon 4B Pallet 2 addon 4C X s 2 Pallet 2 addon 4F PC60636 1 4 20 X 3 BLACK QTY 6 AA6212 1 4 X 3 4 FLAT WASHER QTY 28 AA6125 1 4 20 X 2 1 2 Allen QTY 22 HARDWARE NEEDED Parts Needed Pallet 2 addon 4D X s 2 Pallet 2 addon 4G ...

Page 45: ... FLAT WASHER QTY 3 STEP 44 Install the left 4A trim using three PC60636 bolts and three AA6212 washers STEP 45 Install the left 4E trim using three PC60636 bolts and three AA6212 washers AA6212 1 4 X 3 4 FLAT WASHER QTY 3 PC60636 1 4 20 X 3 QTY 3 ...

Page 46: ...m using two AA6125 bolts and AA6212 washers from the back AA6212 1 4 X 3 4 FLAT WASHER QTY 2 AA6125 1 4 20 X 2 1 2 QTY 2 Plug in LED harnesses at the top before securing It might be necessary to remove the attached 4F cover if harness is not accessible AA6212 1 4 X 3 4 FLAT WASHER QTY 2 AA6125 1 4 20 X 2 1 2 QTY 2 ...

Page 47: ...gether STEP 51 REPEAT STEPS 48 to 50 but use part 4D for step 48 Completed front trim 4G 4F STEP 50 Install one 4F and 4G cover using four AA6125 bolts and AA6212 washers on each AA6125 1 4 20 X 2 1 2 QTY 8 AA6212 1 4 X 3 4 FLAT WASHER QTY 8 ...

Page 48: ...48 Assembly for Steps 52 59 Chapter 7 ...

Page 49: ...49 Parts Needed Pallet 1 loose 1A Pallet 1 loose 1B Pallet 1 loose 1C HARDWARE NEEDED AA6212 1 4 X 3 4 FLAT WASHER BLACK QTY 24 AA6125 1 4 20 X 2 1 2 black Allen QTY 4 AA6584 1 4 20 X 2 BLACK QTY 20 ...

Page 50: ...N HARDWARE Install the 1C center button wall to the back of the game loosely with six AA6584 black Allen bolts and AA6212 black washers Back view AA6212 1 4 X 3 4 black washer AA6584 1 4 20 X 2 BLACK X s 6 Front view 1C 1C 1C ...

Page 51: ...s and AA6212 black washers You might have to shift the upper archway bar Back view Front view STEP 54 From inside the game secure the left back panel to the upper arch using two AA6125 black Allen bolts and AA6212 black washers AA6212 1 4 X 3 4 FLAT WASHER BLACK AA6584 1 4 20 X 2 BLACK X s 7 X s 2 AA6125 1 4 20 X 2 1 2 black 1B 1B 1B ...

Page 52: ...ing seven AA6584 black Allen bolts and AA6212 black washers You might have to shift the upper archway Back view Front view STEP 56 From inside the game secure the left back panel to the upper arch using two AA6125 black Allen bolts and AA6212 black washers AA6212 1 4 X 3 4 FLAT WASHER BLACK AA6584 1 4 20 X 2 BLACK X s 7 1A 1A 1A ...

Page 53: ...53 STEP 57 Tower harnesses Insert cables from each tower assembly into the bottom holes B ...

Page 54: ...ach tower has two network cables Each coupler and cable is colored coded Either one can be used for input or output DO NOT PLUG BOTH CABLES FROM A TOWER INTO THE SAME COUPLER Two pin DC power cables are also at each tower connection Connect the display harness coming from the center tower Direction of network Not physical connections Any cable with the same color can be plugged into same color cou...

Page 55: ...55 TO FRONT OF GAME Right Tower Right Button Center Button Right Center Tower Left Center Tower Left Button Left Tower NETWORK WIRING COLOR CODE STEP 58 ...

Page 56: ...comes from the middle tower on the right Both at the top From the front of the cabinet you can reach in and route the cables up into the jumbotron assembly The other two data harness comes from the left middle tower This harness can be pushed up through the front of the cabinet If you are unable to locate these cables remove the tower covers for easier access ...

Page 57: ...57 Assembly for Steps 60 63 Chapter 8 Part HARDWARE NEEDED AA0655 8 X 3 4 Square pan head QTY6 Pallet 2 loose 2F ...

Page 58: ...ain harness run to that will go to the back of the game Note the location of the ball gate harness Remove keys attached to top of cabinet and put aside 1 Uncoil wires and run to the back of the game 2 Insert the front trim connections through the sides 3 Locate the ball gate wiring harness in the center 2F ...

Page 59: ... podium to the cabinet assembly Unlock the center door and plug in ball gate harness Plug in both left and right front trim LED harnesses See Fig 2 Latch the front cabinet to the back cabinet using the provided latch tool FIG 2 ...

Page 60: ...box CAUTION WARNING SUITABLE E08639 HARNESS CLAMP Underside of Game Step 63 Install wire clips along the right side of the cabinet Run the AC harness from the front to back using the wire clips to secure it to the cabinet Completed chapter 8 Use the 6 holes with pilot holes that match the metal plate ...

Page 61: ... 69 HARDWARE NEEDED PC60622 1 4 20 X 1 QTY 14 AA6125 1 4 20 X 2 1 2 QTY 24 AA6966 1 4 20 nylock QTY 26 AA6185 1 4 x large black washer QTY 34 AA6212 1 4 X 3 4 FLAT WASHER QTY 49 AA6369 1 4 20 X 3 1 2 BLACK QTY 6 AA6584 1 4 20 X 2 QTY 8 ...

Page 62: ... Pallet 2 bundle 1 3I Pallet 1 bundle 2 1T QTY 2 Pallet 1 loose 1M Pallet 2 bundle 1 2R 2R Pallet 2 bundle 1 2Q Pallet 2 bundle 1 2Q Pallet 2 bundle 1 2R 2R Pallet 2 bundle 1 2R 2R Pallet 2 bundle 1 2R 2R ...

Page 63: ... 64 Attach three 1T s to the top of the cabinet as shown Secure using AA6369 bolt and AA6212 washer through the top and AA6212 washer and AA6966 NYLON nut at the bottom AA6369 1 4 20 X 3 1 2 BLACK X s 6 AA6212 1 4 X 3 4 black washer X s 12 ...

Page 64: ...ck washers at the top From the bottom use AA6212 black washer and AA6966 NYLON nuts SEE RED ARROWS 10 per back and front AA6212 1 4 X 3 4 FLAT WASHER BLACK AA6966 1 4 20 nylock black nut PC60622 1 4 20 X 1 BLACK AA6185 1 4 x large black washer STEP 66 Along the sides use seven PC60622 black Allen bolts with AA6185 large black washers SEE BLUE ARROWS LEFT SIDE SHOWN X s 20 X s 14 ...

Page 65: ...Partly install four AA6125 bolts STEP 68 Lift the marquee sign up onto the marquee assembly aligning the holes and sliding it down onto the bolts Tighten using small Allen wrench X s 4 AA6125 1 4 20 X 2 1 2 Black ...

Page 66: ...AT WASHER BLACK X s 8 STEP 69 Attach two 2Q ball deflectors using four AA6584 black Allen bolts and AA6212 black washers at the front 2R mounting plate at the back 2Q 2Q 2R 2R 2R Game Assembly is Completed AA6584 1 4 20 X 2 ...

Page 67: ...game PCB and ticket dispenser Optional Pin 6 Prize Meter Ticket Notch 1 is connected to the Prize or Ticket Meter output from the game PCB and can be used by card systems for monitoring purposes Optional Pin 7 Coin Inhibit Enable is connected to the Coin or Note Inhibit Enable output from the Game PCB and is used where the game has this feature for disabling any payment This is normally for states...

Page 68: ...nel boards amplifier for volume Fuse board one DC power supply and AC power control Located in the middle of the playfield is another access hatch In this area you will find two more DC power supplies and two more fuse boards A fan pulls any heat out of this chamber DB3275x DB3275x wh2134dbx e02010X fe2006 GF2010 GF2010 GF2010 E02010X ...

Page 69: ...UP or DOWN to clear the highlighted audit You must set it to 1 to clear Ticket audits will roll over after 65535 tickets If tracking tickets paid check this audit weekly Press and hold the Blue player s competitive and solo buttons together for ten seconds to clear the high score tables It will exit the menu after clearing Press and hold the Blue player s select button for ten seconds to clear the...

Page 70: ... a ticket 100 10000 100 500 11 Minimum ticket payout for each player per game 1 100 1 10 12 Amount to subtract per solo game from the bonus score if bonus has not been won 100 1000 10 100 13 Amount to subtract per competitive game from the bonus score if bonus has not been won 100 1000 10 100 14 Increases the score needed to win bonus per solo game 0 disables this 0 10000 500 2500 15 Increases the...

Page 71: ...y Press the SELECT and DOWN buttons at the same time in attract mode GAME MUST BE IN ATTRACT MODE TO ENTER DIAGNOSTICS GREEN Selected Sensor board YELLOW Communication is established RED No communication check power RJ45 for proper connections You will also notice the numbers under ID DIPS This indicates the proper dip switch setting for this location IT IS NOT READING THE DIPSWITCHES It is only s...

Page 72: ...switch is low Press the 1P button and the game will dispense 5 tickets If you trigger the coin line a sound will play The selected sensor board will show the digits on the display counting up For target board 15 S1 indicates the left hole and S2 indicates the right hole For target board 16 the upper red display will cycle numbers and the LEFT and RIGHT buttons will swing the arm back and fourth Fo...

Page 73: ...holes and displays Board 16 is Block Arm and Player 2 score display Board 17 is Player 1 display and strobe lights Boards 18 22 are bonus button assemblies LEFT TOWER RIGHT TOWER LEFT MIDDLE TOWER RIGHT MIDDLE TOWER CENTER BUTTON WALL LEFT BUTTON WALL RIGHT BUTTON WALL JUMBOTRON BOARDS ...

Page 74: ... of dipswitches These dipswitches determine the position and function When installing any replacement boards confirm the location of the board and set the dipswitches to match the location Both RJ45 ports are identical Either can be used for in or out communications ...

Page 75: ...75 Tower Covers Part Numbers ...

Page 76: ...76 DECAL PART NUMBERS ...

Page 77: ...nsors 2 FP2009EX Transmitter boards DB3102X Blocker arm and motor assembly three DB2033X target boards two ML2032X display boards and a DB3068X Dot Matrix Grid Removing the DB3068X Dot Matrix grid assembly 4 Then from the front remove the upper support bar 1 Open the upper back door access panel 2 Unplug the two ribbon cables Mark the cables A and B to note where they go 3 Disconnect the DC power ...

Page 78: ...9EX AA0644 PC60643 RB2009EX DB3155 DB3112 AA6753 DB3111 NB2035DB BLUE SX2535DBX RED WR2032X WR2032X ML2032X Display DB3054 Display cover AA6953 Hardware ML2032X Display DB3054 Display cover AA6953 Hardware DB3216X Leaderboard Assembly and Parts ...

Page 79: ...r assembly AA6967 BL1086 2 Remove the four AA6967 shoulder bolts and BL1086 springs 1 Remove DB3068X leaderboard display first then remove the four AA6177 screws holding the DB3154 Motor guard plate to the cabinet 3 Remove the six AA6831 Phillip screws holding the Motor gearbox assembly ...

Page 80: ...80 DB2033X DB3847 DB3845X ML2032X PC60643 AA6203 AA6926 AA0644 AA6177 AA6584 E01667 DB3849X Button Target DB3102X Swing Arm Assembly DB3100 DB3101 DB1054 AA6915 DB7032X AA6831 PC60604 AA6212 ...

Page 81: ...81 AA6020 AA0655 BL4009 E02907BLX DB2033X DB1053 WH3005 AA6512 DB1052 3 per game DB1051 PC60610 PC60610 AA6438 DB4001 AA6227 DB1045 DB4045 DB4045 DB1045 AA6072 E01662 FB2008DBX Target Assembly DB3500X ...

Page 82: ...82 DB3277X ball gate Assembly NS1022 P802 black NS1022 P509 blue ZS2015X Actuator ...

Page 83: ...following When the ball gate is up even in attract if you put the red meter lead in the black blue on P15 there should be 12VDC In game play when the ball gate is up he should see 12V if you move the red meter lead on the orange blue at p15 If you see 12V when you do both of these things then the board is working properly It may not be exactly 12V If it is 11 5 or so then it is good If not there s...

Page 84: ...le Shooting Tips DB2033X Both RJ45 Ports are identical Either can be used for in or out communications A coupler could be used to diagnose network issues if needed to eliminate the target board completely in the chain The communication break should be between the last seen board shown in yellow or green and the next shown in red when in diagnostic mode There is an extra 20 Cat 5 cable included for...

Page 85: ...0 0 Solutions to try 1 General Target check 2 Ensure O Ring Tire and arm are clean and free of dust and oil use air duster and or mild cleaner 3 Ensure motor wheel is positioned correctly on motor shaft slight clearance from screw heads 1 16 max between head of screw to back of the pulley 4 Ensure Motor wheel set screw is tightened on shaft flat 5 Spring washer specific Replace with tall spring MU...

Page 86: ...Swing arm swing arm E01691 15 blue Cat 5 cable RB2009EX Receiver PCB E01690 15 Gray Cat 5 cable FP2009EX Transmitter E01666 3 Cat 5 cable MJ2032X Target Display E01665 2 Cat 5 cable NB2035DB Blue Strobe light assembly SX2535DBX Red Strove light assembly WR2032X 5 Digit display assembly DB2068X Dot Matrix Grid Assembly E00837DBX SDCARD DB2135X Front board DB2034X Main board FE2006 Audio Amp Power S...

Page 87: ...r fault symptoms I C E Inc will assume no liability whatsoever for costs associated with labor or travel time to replace defective parts All defective warranty covered components will be replaced with new or factory refurbished compo nents equal to OEM specifications I C E Inc will cover domestic UPS ground or comparable shipping costs during the warranty period Interna tional or expedited shipmen...

Reviews: