42
STEP 43:
Loosely secure the 2K arch using two AA6125 Allen bolts and AA6212 washers from the backside
and secure them with AA6966 nylon nuts at the front on both sides.
DO NOT TIGHTEN AT THIS TIME.
X’s 4
AA6212 1/4 X 3/4
black washer
AA6966 1/4-20
nylock black nut
AA6125 1/4-20 X 2-1/2
black Allen
Cages Assembled
STEP 42:
Slide the back 2K roof arch into the back legs.
2K
Summary of Contents for DODGEBALL ULTIMATE ARENA
Page 7: ...7 Assembly for Steps 1 8 Chapter 1 ...
Page 16: ...16 Assembly for Steps 9 16 Chapter 2 ...
Page 22: ...22 Assembly for Steps 17 22 Chapter 3 ...
Page 28: ...28 Assembly for Steps 23 26 Chapter 4 ...
Page 33: ...33 Assembly for Steps 27 43 Chapter 5 ...
Page 43: ...43 Assembly for Steps 44 51 Chapter 6 ...
Page 48: ...48 Assembly for Steps 52 59 Chapter 7 ...
Page 53: ...53 STEP 57 Tower harnesses Insert cables from each tower assembly into the bottom holes B ...
Page 75: ...75 Tower Covers Part Numbers ...
Page 76: ...76 DECAL PART NUMBERS ...
Page 82: ...82 DB3277X ball gate Assembly NS1022 P802 black NS1022 P509 blue ZS2015X Actuator ...