• Full-height tape drives must be installed in the lowest two bays of a module. Installing a full-height
drive in the top two bays of a module is not supported.
Connecting cables
Procedures to connect Fibre Channel, SAS, USB, and Ethernet cables.
Connecting Fibre Channel cables
1. Remove the FC port caps if necessary. Attach one end of the FC cable to port 0 on the tape drive.
Figure 48. Full-height FC dual port
Table 23. Full-height FC dual port
Number
Description
1
FC port 0
2
FC port 1
3
Drive sled indicators (see Figure 18 on page 13)
Figure 49. Half-height FC single port
Table 24. Half-height FC single port
Number
Description
1
FC port 0
2
Drive sled indicators (see Figure 18 on page 13)
2. Attach the other end of the FC cable to a switch or HBA.
3. Repeat the same process with port 1 if you have a dual port drive.
Chapter 3. Installing 53
Summary of Contents for TS4300 3555
Page 1: ...IBM TS4300 Tape Library Machine Type 3555 User s Guide IBM SC27 4629 07...
Page 66: ...Chapter 3 Installing 36 IBM TS4300 Tape Library Machine Type 3555 User s Guide...
Page 77: ...Figure 38 Mounting the rails to the connectors Chapter 3 Installing 47...
Page 175: ...Figure 81 Unlocked spooling mechanism enlarged view Chapter 6 Upgrading and servicing 145...
Page 261: ......
Page 262: ...IBM SC27 4629 07...