2. Reassemble the drive sled and reinstall the drive brick by completing these steps:
• Plug in the RS-422 cable, the power cable (if applicable), and the signal cable.
• Push the drive brick fully into the sled.
• Align the two screws holes on each side of the sled with the screw holes on each side of the drive
brick. DO NOT TIGHTEN THE SCREWS COMPLETELY.
• When the drive and sled are properly aligned, fully tighten the screws.
3. Install the tape drive sled in the library.
4. Power ON the library and wait for the library to finish POST (power on self test), inventory, and mid-
tape recovery. This step can take up to 1 hour.
5. If the cartridge does not eject from the drive, move the cartridge from the drive to the I/O station, then
discard the cartridge.
• Operator Panel: Operation > Move Cartridge from Drive to Home Slot
• Management GUI: Drives > Actions > Eject Cartridge from Drive
6. Run Library Verify before normal library operations resume.
7. If necessary, return the failed drive sled to IBM.
198 IBM TS4300 Tape Library Machine Type 3555: User's Guide
Summary of Contents for TS4300 3555
Page 1: ...IBM TS4300 Tape Library Machine Type 3555 User s Guide IBM SC27 4629 07...
Page 66: ...Chapter 3 Installing 36 IBM TS4300 Tape Library Machine Type 3555 User s Guide...
Page 77: ...Figure 38 Mounting the rails to the connectors Chapter 3 Installing 47...
Page 175: ...Figure 81 Unlocked spooling mechanism enlarged view Chapter 6 Upgrading and servicing 145...
Page 261: ......
Page 262: ...IBM SC27 4629 07...