
base library and the expansion frame (if attached) power on at the same time. If the
green power-on indicator fails to light, call your IBM® Service Representative.
Results
When you power on the library, it executes a power on initialization sequence for about 2
minutes. During that time, the menus on the touchscreen display are not available for use.
After the power on initialization sequence, the library performs an inventory of the tape
cartridges, which takes less than 60 seconds per frame. The sequence is complete and the
library is available for use when the message
READY
displays on the Activity screen.
Figure 1. Powering on the TS3500 Tape Library
. The library power switch and the power-on
indicator are located on the operator panel of the base frame (in this example, a model L23
or L53 frame).
Parent topic:
Powering off
This section explains the procedure for turning off the power to the TS3500 Tape Library.