Installing
cables
and
checking
connections
in
the
primary
cabinet
To
install
cables
and
check
the
connections
in
the
primary
cabinet,
complete
the
following
steps:
1.
Make
sure
that
the
source
power
breaker
switches
are
all
turned
off.
2.
Open
the
side
and
rear
doors
of
the
cabinet.
3.
From
the
side
of
the
cabinet,
make
sure
that
all
the
power
cables
between
the
rack
power
distribution
units
(PDUs)
and
the
front-end
PDUs
are
fully
seated.
4.
From
the
back
of
the
cabinet,
push
on
all
the
cable
connectors
running
from
the
rack-mounted
devices
powered
by
the
power
distribution
units
to
make
sure
that
the
cables
are
fully
seated.
5.
Connect
power
to
the
power
distribution
units.
Use
a
NEMA
L6-20,
280
V
ac,
single-phase
power
cable.
a.
Connect
the
power
cable
to
the
power
distribution
unit.
b.
Draw
the
power
cable
through
the
opening
at
the
base
of
the
cabinet.
c.
Connect
the
power
cable
to
the
electrical
outlet.
d.
Turn
on
the
power
breaker
switch
for
the
source
power.
e.
Make
sure
that
the
power
distribution
unit
circuit
breakers
are
in
the
On
position.
6.
Make
sure
that
all
internal
power
distribution
units
are
turned
on
by
viewing
the
power-on
LEDs
on
the
power
distribution
unit
connected
components.
v
When
power
is
applied,
servers
display
a
flashing
green
LED
on
the
front
panel.
v
The
following
devices
have
no
power
switch
and
turn
on
automatically
when
the
power
distribution
units
are
turned
on.
Make
sure
that
the
following
components
have
power
applied:
–
KVM
switch
–
Cisco
10/100
switch
–
Cisco
Gigabit
switch
All
rack-mounted
devices
are
powered
by
the
internal
PDU.
Turning
on
the
power
to
the
expansion
cabinets
To
turn
on
the
expansion
cabinets,
complete
the
following
steps:
1.
Turn
on
the
cluster
nodes
using
their
power
switches.
2.
Make
sure
that
the
management
node
has
power.
A
green
LED
on
the
front
panel
is
lit
to
indicate
that
the
node
has
power.
3.
After
an
expansion
cabinet
is
turned
on,
make
sure
that
all
front
panel
LEDs
on
the
cluster
nodes
are
lit;
otherwise,
not
all
the
nodes
will
be
shown
in
the
configuration.
Repeat
the
procedure
for
every
expansion
cabinet
unit
in
the
cluster
before
powering
on
the
primary
cabinet.
Turning
on
the
power
to
the
primary
cabinet
To
turn
on
the
primary
cabinet,
complete
the
following
steps:
1.
Storage
expansion
units
-
on
the
back
of
each
storage
expansion
unit
turn
on
the
circuit
breakers.
2.
Storage
controllers
-
on
the
back
of
each
storage
controller
turn
on
the
circuit
breakers.
3.
Management
node
-
on
the
front
of
each
,
turn
on
the
power
switch.
Make
sure
that
the
node
passes
POST
with
no
errors.
During
the
startup
process
make
sure
that
the
PXE
boot
agent
utility
program
attempts
to
run.
If
it
does
not,
press
F1
to
start
the
Configuration/Setup
utility
program
and
add
Network
as
24
IBM
System
Cluster
1350
Installation
and
Service
Guide
Summary of Contents for System Cluster 1350
Page 1: ...IBM System Cluster 1350 Installation and Service Guide...
Page 2: ......
Page 3: ...IBM System Cluster 1350 Installation and Service Guide...
Page 28: ...12 IBM System Cluster 1350 Installation and Service Guide...
Page 46: ...30 IBM System Cluster 1350 Installation and Service Guide...
Page 50: ...34 IBM System Cluster 1350 Installation and Service Guide...
Page 58: ...42 IBM System Cluster 1350 Installation and Service Guide...
Page 65: ......
Page 66: ...Part Number 44R5023 Printed in USA 1P P N 44R5023...