To
finish
the
cabinet
placement,
complete
the
following
steps:
1.
Inspect
the
cabinets,
components,
and
cable
connections
for
shipping
damage.
2.
Install
the
frame-stabilizer
foot
on
each
cabinet.
shows
how
to
install
a
frame-stabilizer
foot.
Installing
a
stability
kit
A
stability
kit
(IBM
part
number
31L8305),
containing
one
stability
kit,
is
included
with
the
1410
rack.
Install
the
stability
kit
when
the
rack
is
at
the
final
installation
location.
shows
the
attachment
of
the
stability
kit.
Front tilt foot
Engaging
the
side
stabilizers
The
rack
cabinet
provides
side
stabilizers,
to
give
additional
support
to
the
rack
unit.
Engage
the
side
stabilizers
when
the
rack
is
at
the
final
installation
location.
For
more
information
about
how
to
engage
the
stabilizers,
see
the
documentation
that
came
with
your
rack
cabinet.
Floor
loading
To
determine
the
clearances
required
for
each
rack,
you
must
know
the
maximum
floor
load
rating
in
pounds
per
square
foot
or
kilograms
per
square
meter
at
your
installation
site.
shows
the
necessary
clearances
or
weight-distribution
distances
for
a
fully
configured
rack.
The
weight-distribution
Figure
3.
Cluster
1350
stability
kit
16
IBM
System
Cluster
1350
Installation
and
Service
Guide
Summary of Contents for System Cluster 1350
Page 1: ...IBM System Cluster 1350 Installation and Service Guide...
Page 2: ......
Page 3: ...IBM System Cluster 1350 Installation and Service Guide...
Page 28: ...12 IBM System Cluster 1350 Installation and Service Guide...
Page 46: ...30 IBM System Cluster 1350 Installation and Service Guide...
Page 50: ...34 IBM System Cluster 1350 Installation and Service Guide...
Page 58: ...42 IBM System Cluster 1350 Installation and Service Guide...
Page 65: ......
Page 66: ...Part Number 44R5023 Printed in USA 1P P N 44R5023...