Each node canister has four Fibre Channel ports located on the left side of the
canister as shown in Figure 12. The ports are in two rows of two ports. The ports
are numbered 1 - 4 from left to right and top to bottom.
Note:
The reference to the left and right locations applies to canister 1, which is
the upper canister. The port locations are inverted for canister 2, which is the lower
canister.
There are two green LEDs associated with each port: the speed LED and the link
activity LED. These LEDs are in the shape of a triangle. The LEDs are located in
between the two rows of the ports as shown in Figure 13. Figure 13 shows the
LEDs for the Fibre Channel ports on canister 1. Each LED points to the associated
port. The first and second LEDs in each set show the speed state, and the third
and fourth LEDs show the link state.
svc00689
Figure 12. Fibre Channel ports on the node canisters
svc00685
5
6
7
8
1
2
4
3
1
2
3
4
Figure 13. LEDs on the Fibre Channel ports
Chapter 1. Storwize V7000 hardware components
9
Summary of Contents for Storwize V7000
Page 1: ...IBM Storwize V7000 Troubleshooting Recovery and Maintenance Guide GC27 2291 05...
Page 36: ...18 Storwize V7000 Troubleshooting Recovery and Maintenance Guide...
Page 42: ...24 Storwize V7000 Troubleshooting Recovery and Maintenance Guide...
Page 46: ...28 Storwize V7000 Troubleshooting Recovery and Maintenance Guide...
Page 60: ...42 Storwize V7000 Troubleshooting Recovery and Maintenance Guide...
Page 88: ...70 Storwize V7000 Troubleshooting Recovery and Maintenance Guide...
Page 176: ...158 Storwize V7000 Troubleshooting Recovery and Maintenance Guide...
Page 178: ...160 Storwize V7000 Troubleshooting Recovery and Maintenance Guide...
Page 186: ...168 Storwize V7000 Troubleshooting Recovery and Maintenance Guide...
Page 187: ......
Page 188: ...Printed in USA GC27 2291 05...