• Ensure that a suitably rated mechanical lift is available to support the weight of the expansion enclosure
as it inserted into the rack for installation.
About this task
The 5U expansion enclosure and most parts are shipped together in one large box. A tray on the top of the
enclosure contains the front fascia (1U and 4U pieces), the cable management arm (CMA), and the slide
rail kit; you must install these parts. Figure 20 on page 29 shows how the enclosure is packaged for
shipment.
Figure 20. Tray containing expansion enclosure parts
1
Slide rail kit
2
Cable management arm
3
Fascia
Other parts, such as the cover, secondary expander modules, and fans, are installed in the enclosure.
However, due to weight considerations, you must remove some parts and then reinstall them as part of
the initial installation process.
Note: Drives are not included in installation package for the enclosure; they are provided in a separate
package.
Procedure
1. Remove the cardboard tray that contains the slide rails, cable management arm, and fascia from the
cardboard box in which the expansion enclosure was shipped.
2. Remove the foam end pieces from the top of the 5U expansion enclosure.
3. Cut the corners of the shipping box and fold them down to uncover the sides and faces of the
expansion enclosure, as shown in Figure 21 on page 29.
Figure 21. Packaging materials
1
Enclosure
2
Top of shipping box, folded back.
3
Foam protectors
4. Remove the top cover, as described in “Removing the top cover” on page 31.
Chapter 2. Installing the system hardware 29
Summary of Contents for Storwize V5100 Series
Page 129: ......