7.
Move to the rear of the system, and,attach the left and right tie-down brackets (
A
) with four M5 x
16mm screws (two on each bracket), as shown in the following figure. The tie-down brackets ensure
that the chassis is securely fastened to the rack.
Figure 13. Attaching the left and right tie-down brackets
Figure 14. Installed left and right tie-down brackets
Installing the server into a rack
13
Summary of Contents for Power 750 Express 8408-E8D
Page 2: ......
Page 6: ...iv Power Systems Installing the IBM Power 750 8408 E8D and IBM PowerLinux 7R4 8248 L4T...
Page 30: ...18 Power Systems Installing the IBM Power 750 8408 E8D and IBM PowerLinux 7R4 8248 L4T...
Page 42: ...30 Power Systems Installing the IBM Power 750 8408 E8D and IBM PowerLinux 7R4 8248 L4T...
Page 65: ......
Page 66: ...Part Number 00L5075 Printed in USA GI11 9890 01 1P P N 00L5075...