the EIA location directly above the lowest EIA unit used, on both the front and the back of the rack.
5.
Rotate the hinged rail latch upward to hold the rail in place against the front EIA support flange.
6.
Repeat steps 1 through 5 for the left rail.
7.
Secure both rails to the front EIA support flange using two M5 x 16mm screws (
C
).
8.
At the rear of the rack, rotate the hinged rail latch upward to hold each rail in place against the rear
EIA support flange.
Figure 2. Front of rack rail alignment and nut clip locations
4
Power Systems: Installing the IBM Power 750 (8408-E8D) and IBM PowerLinux 7R4 (8248-L4T)
Summary of Contents for Power 750 Express 8408-E8D
Page 2: ......
Page 6: ...iv Power Systems Installing the IBM Power 750 8408 E8D and IBM PowerLinux 7R4 8248 L4T...
Page 30: ...18 Power Systems Installing the IBM Power 750 8408 E8D and IBM PowerLinux 7R4 8248 L4T...
Page 42: ...30 Power Systems Installing the IBM Power 750 8408 E8D and IBM PowerLinux 7R4 8248 L4T...
Page 65: ......
Page 66: ...Part Number 00L5075 Printed in USA GI11 9890 01 1P P N 00L5075...