Figure 21. Attaching the low-profile tailstock to a PCIe adapter
15. If the new adapter is a 4-Port 10/100/1000 Base-TX PCI Express adapter, first engage the tailstock
with the tabs on the card hardware. After the tailstock is attached, secure the tailstock with its screw.
16. If the new adapter is an Ethernet or Fibre Channel adapter, you must attach the SFP transceivers
after you replace the tailstock.
To attach the SFP transceivers, complete the following steps:
a) Place the card flat on a static-protective surface.
b) Slide the transceiver (A) into the adapter hardware.
c) With the latch (B) in the open position, push the latch by rotating it up and toward the card as
shown in Figure 22 on page 29.
d) Repeat for the other transceiver.
28 Power Systems: PCIe adapters for the 9080-M9S
Summary of Contents for FC EJ05
Page 1: ...Power Systems PCIe adapters for the 9080 M9S IBM ...
Page 4: ...iv ...
Page 14: ...xiv Power Systems PCIe adapters for the 9080 M9S ...
Page 64: ...50 Power Systems PCIe adapters for the 9080 M9S ...
Page 65: ......
Page 66: ...IBM ...