LCD Progress Indicator Log
The following is an example of the LCD progress indicator log.
The progress indicators (checkpoints) are displayed in two sections. Above the dashed
line are the progress indicators from the boot that produced the current sessions. Below
the dashed line are progress indicators from the boot preceding the one that produced
the current sessions.
The progress indicator codes are chronological from bottom to top. The dashed line
merely represents the point where the latest boot started.
LCD Progress Indicator Log
C33744FE
C33644FE
C33544FE
C33444FE
C33344FE
C33244FE
C33144FE
C33044FE
C1022001
C13F2090
C13F2060
C13F2050
C1012001
C1002001
C100D500
C100806E
--------
E075
E07A
E075
Press Return to continue, or 'x' to return to menu. >
94
S80 and S85 User’s Guide
Summary of Contents for Enterprise Server S80
Page 1: ...Enterprise Server S80 pSeries 680 Model S85 User s Guide SA38 0557 01 IBM...
Page 10: ...x S80 and S85 User s Guide...
Page 14: ...xiv S80 and S85 User s Guide...
Page 16: ...xvi S80 and S85 User s Guide...
Page 21: ...Chapter 1 System Introduction 3...
Page 26: ...8 S80 and S85 User s Guide...
Page 124: ...106 S80 and S85 User s Guide...
Page 158: ...I O Drawer 3 Locations 140 S80 and S85 User s Guide...
Page 194: ...176 S80 and S85 User s Guide...
Page 214: ...196 S80 and S85 User s Guide...
Page 216: ...198 S80 and S85 User s Guide...
Page 218: ...200 S80 and S85 User s Guide...
Page 220: ...202 S80 and S85 User s Guide...
Page 228: ...210 S80 and S85 User s Guide...
Page 232: ...214 S80 and S85 User s Guide...
Page 236: ...218 S80 and S85 User s Guide...
Page 264: ...246 S80 and S85 User s Guide...
Page 274: ...256 S80 and S85 User s Guide...
Page 281: ......