Figure 84. Connecting the power cords
11. When the service processor comes up to the standby state (the power-on LED on the control panel is
flashing slowly), continue to the next step.
12. Turn off the identify LED. For instructions, see Deactivating an identify LED (www.ibm.com/support/
knowledgecenter/POWER9/p9haj/p9haj_turn_off_identify_led.htm).
13. Start the system. For instructions, see Starting a system (www.ibm.com/support/knowledgecenter/
POWER9/p9haj/crustartsys.htm).
14. Verify the installed part.
• If you replaced the part because of a service action, verify the installed part. For instructions, see
https://www.ibm.com/support/knowledgecenter/POWER9/p9ect/
pxect_verifyrepair.htm (www.ibm.com/support/knowledgecenter/POWER9/p9ect/
pxect_verifyrepair.htm).
• If you installed the part for any other reason, verify the installed part. For instructions, see https://
www.ibm.com/support/knowledgecenter/POWER9/p9haj/pxhaj_hsmverify.htm (www.ibm.com/
support/knowledgecenter/POWER9/p9haj/pxhaj_hsmverify.htm).
System backplane for the 9040-MR9 83
Summary of Contents for 9040-MR9
Page 1: ...Power Systems System backplane for the 9040 MR9 IBM...
Page 4: ...iv...
Page 14: ...xiv Power Systems System backplane...
Page 17: ...or or or or System backplane for the 9040 MR9 3...
Page 98: ...84 Power Systems System backplane...
Page 109: ......
Page 110: ...IBM...