© Copyright IBM Corp. 1994, 1998
137
Notices
References in this publication to IBM products, programs or services do not imply that
IBM intends to make these available in all countries in which IBM operates. Any
reference to an IBM product, program, or service is not intended to state or imply that
only IBM’s product, program, or service may be used. Any functionally equivalent
product, program, or service that does not infringe any of IBM’s intellectual property
rights may be used instead of the IBM product, program, or service. Evaluation and
verification of operation in conjunction with other products is the user’s responsibility.
IBM may have patents or pending patent applications covering subject matter in this
document. The furnishing of this document does not give you any license to these
patents. You can send license inquiries in writing to the IBM Director of Licensing,
IBM Corporation, 500 Colombus Avenue, Thornwood, New York 10594, U.S.A.
Industry Standards Reflected in This Product
The IBM 8265 Nways ATM Switch is designed according to the specifications of the
following industry standards as understood and interpreted by IBM as of October
1992.
International Organization for Standardization (ISO)
•
ISO 8802/1
•
ISO 8802/3
•
ISO 8802/5
IEEE (Institute of Electrical and Electronic Engineers)
•
802.1 Local area network (LAN) management and Internet working
•
802.3 Carrier sense multiple access and collision detection
•
802.5 Token passing ring
ITU-T (International Telecommunication Union - Telecommunication)
The IBM standards for the implementation of ATM are:
•
Q.2110 Service Specific Connection-Oriented Protocol (SSCOP)
•
Q.2130 Service Specific Coordination Function (SSCF)
ATM Forum
ATM Forum has defined the ATM User-Network Interface (UNI) Specification V3.0
and 3.1.
Summary of Contents for 8265
Page 1: ...8265 Nways ATM Switch Planning and Site Preparation Guide GA33 0460 0 IBM...
Page 2: ......
Page 3: ...8265 Nways ATM Switch Planning and Site Preparation Guide GA33 0460 01 IBM...
Page 8: ...vi IBM 8265 Planning and Site Preparation Guide...
Page 10: ...viii IBM 8265 Planning and Site Preparation Guide...
Page 14: ...xii IBM 8265 Planning and Site Preparation Guide...
Page 16: ...xiv IBM 8265 Planning and Site Preparation Guide...
Page 26: ...10 IBM 8265 Planning and Site Preparation Guide...
Page 38: ...22 IBM 8265 Planning and Site Preparation Guide...
Page 70: ...54 IBM 8265 Planning and Site Preparation Guide...
Page 118: ...102 IBM 8265 Planning and Site Preparation Guide...
Page 121: ...Copyright IBM Corp 1994 1998 105 Appendix C Blank Planning Charts...
Page 122: ...106 IBM 8265 Planning and Site Preparation Guide...
Page 123: ...Appendix C Blank Planning Charts 107...
Page 124: ...108 IBM 8265 Planning and Site Preparation Guide...
Page 126: ...110 IBM 8265 Planning and Site Preparation Guide...
Page 128: ...112 IBM 8265 Planning and Site Preparation Guide...
Page 130: ...114 IBM 8265 Planning and Site Preparation Guide...
Page 132: ...116 IBM 8265 Planning and Site Preparation Guide...
Page 134: ...118 IBM 8265 Planning and Site Preparation Guide...
Page 136: ...120 IBM 8265 Planning and Site Preparation Guide...
Page 138: ...122 IBM 8265 Planning and Site Preparation Guide...
Page 140: ...124 IBM 8265 Planning and Site Preparation Guide...
Page 142: ...126 IBM 8265 Planning and Site Preparation Guide...
Page 144: ...128 IBM 8265 Planning and Site Preparation Guide...
Page 146: ...130 IBM 8265 Planning and Site Preparation Guide...
Page 148: ...132 IBM 8265 Planning and Site Preparation Guide...
Page 152: ...136 IBM 8265 Planning and Site Preparation Guide...
Page 163: ......