Chapter 7. Planning for Media Modules
69
T1, E1, and J1 Line Characteristics
Table 46 summarizes the characteristics according to the type of line.
Table 46. T1, E1, and J1 Line Characteristics
Characteristic
T1
E1
J1
Fractional Support
no
Line Speed
1.544Mbps
2.048Mbps
1.544Mbps
Payload
Clear channel:
1.536Mbps
Clear channel:
1.920 or 1.984Mbps
Clear channel:
1.536Mbps
Clock Extraction
Yes
Yes
No
Connector Type
RJ48C/CA48C
DB15/CA31A
Coaxial:
•
BNC, 75
W
line
impedance
Twisted-Pair:
•
Open wires, 120
W
line impedance
ISO IS8877
Number of Line
Attachments
Up to 4 line attachments per I/O card
Physical Interfaces
Interface type:
•
DS1
•
DSX1
(maximum length of
cable to DSU-end
110 ft.)
Standards
•
AT&T 62411
•
ANSI T1.403
•
EIA IA.547
ITU-T G.703
Interface type:
•
NTT
•
DS1
•
DSX1
(maximum length of
cable to DSU-end
110 ft.)
Standards
•
JT-I411a
•
JT-I431a
•
ANSI T1.403
•
NTT HSDLCS
Code
B8ZS
AMI
HBD3
B8ZS
Frame Format
D4 (SF), D5 (ESF) for:
•
T1.403
•
T1.407
•
AT&T 62411.
•
ITU-T G.703
unstructured
•
ITU-T G.704 with or
without CRC
•
ITU-T G.706 support
for frame alignment /
CRC procedure
NTT-I interface format
Alarm
T1.M1
AT&T 62411
ITU-T G.703
ITU-T G.732
Summary of Contents for 8265
Page 1: ...8265 Nways ATM Switch Planning and Site Preparation Guide GA33 0460 0 IBM...
Page 2: ......
Page 3: ...8265 Nways ATM Switch Planning and Site Preparation Guide GA33 0460 01 IBM...
Page 8: ...vi IBM 8265 Planning and Site Preparation Guide...
Page 10: ...viii IBM 8265 Planning and Site Preparation Guide...
Page 14: ...xii IBM 8265 Planning and Site Preparation Guide...
Page 16: ...xiv IBM 8265 Planning and Site Preparation Guide...
Page 26: ...10 IBM 8265 Planning and Site Preparation Guide...
Page 38: ...22 IBM 8265 Planning and Site Preparation Guide...
Page 70: ...54 IBM 8265 Planning and Site Preparation Guide...
Page 118: ...102 IBM 8265 Planning and Site Preparation Guide...
Page 121: ...Copyright IBM Corp 1994 1998 105 Appendix C Blank Planning Charts...
Page 122: ...106 IBM 8265 Planning and Site Preparation Guide...
Page 123: ...Appendix C Blank Planning Charts 107...
Page 124: ...108 IBM 8265 Planning and Site Preparation Guide...
Page 126: ...110 IBM 8265 Planning and Site Preparation Guide...
Page 128: ...112 IBM 8265 Planning and Site Preparation Guide...
Page 130: ...114 IBM 8265 Planning and Site Preparation Guide...
Page 132: ...116 IBM 8265 Planning and Site Preparation Guide...
Page 134: ...118 IBM 8265 Planning and Site Preparation Guide...
Page 136: ...120 IBM 8265 Planning and Site Preparation Guide...
Page 138: ...122 IBM 8265 Planning and Site Preparation Guide...
Page 140: ...124 IBM 8265 Planning and Site Preparation Guide...
Page 142: ...126 IBM 8265 Planning and Site Preparation Guide...
Page 144: ...128 IBM 8265 Planning and Site Preparation Guide...
Page 146: ...130 IBM 8265 Planning and Site Preparation Guide...
Page 148: ...132 IBM 8265 Planning and Site Preparation Guide...
Page 152: ...136 IBM 8265 Planning and Site Preparation Guide...
Page 163: ......