Chapter 1. Choosing a Site for the IBM 8265
9
Location Requirements
An 8265 ATM Switch must be installed in an area that meets the following
requirements:
•
Relative humidity: less than 95%, non-condensing
•
Power source within 6 feet (approximately 2.7 meters)
•
Safety regulations stipulate that the table or rack on which the switch rests should
be able to support at least 360 lbs. (163 kg),
three times
the weight of a fully
loaded switch.
•
The surface on which the 8265 switch is installed is level.
•
For rack installations, the selected rack must be grounded (preferably to a
protective earth ground). Observe the following precautions and guidelines
(particularly if your rack has an open back or open sides):
– Before attempting to rack mount the switch, first make sure the selected rack
can support at least 360 lbs. or 163 kg.
– Bolt the rack to the floor.
– Brace the top of the rack to the wall.
– Provide sufficient vertical space in your rack for each switch you wish to
install.
– For proper ventilation, install the switch in a rack that has an open back.
– Install patch panels in the rack for easier cable management.
– Install the cable tray beneath the switch. The cable tray is designed to
manage the cables exiting from the front of the switch by feeding them under
and through the back of the unit.
Table 11 shows the amount of rack space needed to install an 8265 Switch in a Telco rack or
a Metric rack.
Table 11. 8265 Switch Telco and Metric Rack Space Requirements
Model Height
1
Telco Rack
2
Metric Rack
3
Front Clearance
4
17S
26.6 inches
(67.4 cm)
15 U
27 SU
3 inches
(8.0 cm)
Notes:
1
The height of the switch chassis, allowing for some extension beyond the location of
the upper and lower unit dividing lines.
2
The unit of measure is 1 Unit (1.75 inches, or 4.42 cm).
3
The unit of measure is 1 System Unit (25 millimetres).
4
This is the recommended minimum space required between the front of the switch
and another vertical surface (such as a rack door).
Summary of Contents for 8265
Page 1: ...8265 Nways ATM Switch Planning and Site Preparation Guide GA33 0460 0 IBM...
Page 2: ......
Page 3: ...8265 Nways ATM Switch Planning and Site Preparation Guide GA33 0460 01 IBM...
Page 8: ...vi IBM 8265 Planning and Site Preparation Guide...
Page 10: ...viii IBM 8265 Planning and Site Preparation Guide...
Page 14: ...xii IBM 8265 Planning and Site Preparation Guide...
Page 16: ...xiv IBM 8265 Planning and Site Preparation Guide...
Page 26: ...10 IBM 8265 Planning and Site Preparation Guide...
Page 38: ...22 IBM 8265 Planning and Site Preparation Guide...
Page 70: ...54 IBM 8265 Planning and Site Preparation Guide...
Page 118: ...102 IBM 8265 Planning and Site Preparation Guide...
Page 121: ...Copyright IBM Corp 1994 1998 105 Appendix C Blank Planning Charts...
Page 122: ...106 IBM 8265 Planning and Site Preparation Guide...
Page 123: ...Appendix C Blank Planning Charts 107...
Page 124: ...108 IBM 8265 Planning and Site Preparation Guide...
Page 126: ...110 IBM 8265 Planning and Site Preparation Guide...
Page 128: ...112 IBM 8265 Planning and Site Preparation Guide...
Page 130: ...114 IBM 8265 Planning and Site Preparation Guide...
Page 132: ...116 IBM 8265 Planning and Site Preparation Guide...
Page 134: ...118 IBM 8265 Planning and Site Preparation Guide...
Page 136: ...120 IBM 8265 Planning and Site Preparation Guide...
Page 138: ...122 IBM 8265 Planning and Site Preparation Guide...
Page 140: ...124 IBM 8265 Planning and Site Preparation Guide...
Page 142: ...126 IBM 8265 Planning and Site Preparation Guide...
Page 144: ...128 IBM 8265 Planning and Site Preparation Guide...
Page 146: ...130 IBM 8265 Planning and Site Preparation Guide...
Page 148: ...132 IBM 8265 Planning and Site Preparation Guide...
Page 152: ...136 IBM 8265 Planning and Site Preparation Guide...
Page 163: ......