Chapter 4. Planning for Fiber Connections
35
Table 25 shows the total power loss calculation for each link in the connection.
Table 25. Power Loss Calculation (Example)
LInk
Component
Power Loss (dBm)
Reference
Desktop A
to
8265 B
Cable connector (to ATM Desktop)
0.7
Table 20
100 meter cable
0.25 (worst case)
Table 22
Cable connector (to wall socket)
0.7
Table 20
Wall socket (physical contact)
0.4
Table 20
Wall socket (non-physical contact in wall)
0.7
Table 20
200 meter cable (in wall)
0.5 (worst case)
Table 22
Cable connector (to patch panel)
0.7
Table 20
Patch panel
1.0 (worst case)
Table 23
Jumper cable (from patch panel to 8265 B)
0.75
Table 24
Total Power Loss for Link =
5.7
8265 B
to
8265 C
Jumper cable (from 8265 B to patch panel)
0.75
Table 24
Patch panel
1.0 (worst case)
Table 23
Cable connector (to one patch panel)
0.7
Table 20
2 kilometer cable (between buildings)
5.0 (worst case)
Table 23
Fusion splice
0.15
Table 21
Cable connector (to other patch panel)
0.7
Table 20
Patch panel
1.0 (worst case)
Table 23
Jumper cable (from patch panel to 8265 C)
0.75
Table 24
Total Power Loss for Link =
10.05
8265 B
to
Desktop D
Jumper cable (from 8265 C to patch panel)
0.75
Table 24
Patch panel
1.0
Table 23
Cable connector (to patch panel)
0.7
Table 20
400 meter cable (in wall)
1.0 (worst case)
Table 22
Wall socket (non-physical contact in wall)
0.7
Table 20
Wall socket (physical contact)
0.4
Table 20
Cable connector (to wall socket)
0.7
Table 20
100 meter cable
0.25 (worst case)
Table 23
Cable connector (to ATM desktop)
0.75
Table 20
Total Power Loss for Link =
6.25
Summary of Contents for 8265
Page 1: ...8265 Nways ATM Switch Planning and Site Preparation Guide GA33 0460 0 IBM...
Page 2: ......
Page 3: ...8265 Nways ATM Switch Planning and Site Preparation Guide GA33 0460 01 IBM...
Page 8: ...vi IBM 8265 Planning and Site Preparation Guide...
Page 10: ...viii IBM 8265 Planning and Site Preparation Guide...
Page 14: ...xii IBM 8265 Planning and Site Preparation Guide...
Page 16: ...xiv IBM 8265 Planning and Site Preparation Guide...
Page 26: ...10 IBM 8265 Planning and Site Preparation Guide...
Page 38: ...22 IBM 8265 Planning and Site Preparation Guide...
Page 70: ...54 IBM 8265 Planning and Site Preparation Guide...
Page 118: ...102 IBM 8265 Planning and Site Preparation Guide...
Page 121: ...Copyright IBM Corp 1994 1998 105 Appendix C Blank Planning Charts...
Page 122: ...106 IBM 8265 Planning and Site Preparation Guide...
Page 123: ...Appendix C Blank Planning Charts 107...
Page 124: ...108 IBM 8265 Planning and Site Preparation Guide...
Page 126: ...110 IBM 8265 Planning and Site Preparation Guide...
Page 128: ...112 IBM 8265 Planning and Site Preparation Guide...
Page 130: ...114 IBM 8265 Planning and Site Preparation Guide...
Page 132: ...116 IBM 8265 Planning and Site Preparation Guide...
Page 134: ...118 IBM 8265 Planning and Site Preparation Guide...
Page 136: ...120 IBM 8265 Planning and Site Preparation Guide...
Page 138: ...122 IBM 8265 Planning and Site Preparation Guide...
Page 140: ...124 IBM 8265 Planning and Site Preparation Guide...
Page 142: ...126 IBM 8265 Planning and Site Preparation Guide...
Page 144: ...128 IBM 8265 Planning and Site Preparation Guide...
Page 146: ...130 IBM 8265 Planning and Site Preparation Guide...
Page 148: ...132 IBM 8265 Planning and Site Preparation Guide...
Page 152: ...136 IBM 8265 Planning and Site Preparation Guide...
Page 163: ......