7.
Install both original Enclosure Services Managers (ESMs).
a.
Hold the ESM so that the handle
(A)
is fully extended.
b.
Gently slide the ESM into the bay until the ESM stops.
c.
Rotate the handle downward into the closed position until it clicks.
d.
Reconnect the SAS cables to the ESM.
e.
Repeat these steps to install the other ESM.
8.
Install both original power supplies and disk drives.
a.
Replace all the disk drives, following the “Disk unit” on page 3 replacement procedures.
b.
Hold the replacement power supply so that the handle is fully extended downward.
c.
Gently slide the power supply into the bay until it stops.
d.
Rotate the handle upward into the closed position until it clicks.
e.
Reconnect the power cable to the power supply.
f.
Turn on the power supply switch on the right side of the power supply being replaced.
g.
Repeat these steps to install the other power supply.
Power supply
How to service the power supply.
Use this procedure to service the power supply.
The power supply can be serviced concurrently or nonconcurrently.
10
Summary of Contents for 5886
Page 1: ...Power Systems 5886 removal and replacement procedures...
Page 2: ......
Page 3: ...Power Systems 5886 removal and replacement procedures...
Page 6: ...iv...
Page 26: ...14...
Page 36: ...24...
Page 37: ......
Page 38: ...Printed in USA...