Table 1. User settings (continued)
Submenu
Available settings
Default settings
In/Out settings
(continued)
Load segments -
Auto start delay
[No Delay] [1 s] [2
s]...[65354 s]
The unit is powered
on with the specified
delay relative to the
primary outlet group.
Outlet Group 1: [3 s]
Outlet Group 2: [6 s]
Load segments -
Auto shutdown delay
[Disabled] [0s] [1 s]
[2 s]...[65354 s]
During a power
outage, authorizes
UPS to turn off
power to equipment
connected to Group 1
and/or Group 2
outlets.
This feature allows
the shedding of
non-critical loads in
order to conserve
battery power for
critical loads
connected to the
Primary outlet group.
Outlet Group 1:
[Disabled]
Outlet Group 2:
[Disabled]
Overload prealarm
[5 %] [10 %] [15 %]
[20 %] ... [100 %] [105
%]
Sets critical
percentage of load
where alarm
overload alarm
occurs.
[105%]
Chapter 2. Presentation
15
Summary of Contents for 5594-1AX
Page 1: ...IBM 2U Rack or Tower UPS RT1 5kVA RT2 2kVA and RT3 0kVA Installation and User s Guide...
Page 2: ......
Page 3: ...IBM 2U Rack or Tower UPS RT1 5kVA RT2 2kVA and RT3 0kVA Installation and User s Guide...
Page 6: ...iv Installation and User s Guide...
Page 20: ...4 Installation and User s Guide...
Page 34: ...18 Installation and User s Guide...
Page 52: ...36 Installation and User s Guide...
Page 58: ...42 Installation and User s Guide...
Page 62: ...46 Installation and User s Guide...
Page 69: ...Taiwan Class A compliance statement Appendix C Notices 53...
Page 70: ...54 Installation and User s Guide...
Page 72: ...56 Installation and User s Guide...
Page 73: ......
Page 74: ...Part Number 47C9191 Printed in USA 1P P N 47C9191...