Installing the hot-swap power supply cage
This procedure applies only to server models that have hot-swap power-supplies.
To install the hot-swap power supply cage, complete the following steps:
1. Place the power-supply cage into the chassis and slide it toward the rear of the
server until the retaining clips engage the top of the chassis.
2. Install the four screws that secure the power-supply cage to the chassis.
3. Connect the cables from the power-supply cage to the system board and all
internal components.
4. Reinstall both hot-swap power supplies (see “Installing a hot-swap power
supply” on page 74).
5. Install the side cover (see “Installing the side cover” on page 53).
6. Lock the side cover if you unlocked it during removal.
7. Reconnect the external cables and power cords; then, turn on the attached
devices and turn on the server.
Chapter 4. Removing and replacing server components
95
Summary of Contents for 4367
Page 1: ...System x3200 M2 Types 4367 and 4368 Problem Determination and Service Guide ...
Page 2: ......
Page 3: ...System x3200 M2 Types 4367 and 4368 Problem Determination and Service Guide ...
Page 32: ...14 System x3200 M2 Types 4367 and 4368 Problem Determination and Service Guide ...
Page 50: ...32 System x3200 M2 Types 4367 and 4368 Problem Determination and Service Guide ...
Page 64: ...46 System x3200 M2 Types 4367 and 4368 Problem Determination and Service Guide ...
Page 138: ...120 System x3200 M2 Types 4367 and 4368 Problem Determination and Service Guide ...
Page 258: ...240 System x3200 M2 Types 4367 and 4368 Problem Determination and Service Guide ...
Page 265: ......
Page 266: ... Part Number 49Y0163 Printed in USA 1P P N 49Y0163 ...