1
Assembly
wing
nuts
2
Hold-down
bracket
3
Wing
nut
4.
Position
the
rear,
hold-down
bracket
2
towards
the
end
of
the
rail
assemblies
and
tighten
the
wing
nut
3
.
See
5.
Select
the
holes
in
the
rail
where
you
want
to
position
the
2145
UPS-1U.
Note:
The
bottom
flange
of
the
support
rail
must
align
with
the
EIA
mark
on
the
rack.
6.
Using
two
M6
×
10
screws
(
1
in
and
two
clip
nuts
2
,
attach
the
rail
to
the
rear
of
the
rack.
7.
Attach
only
the
bottom
hole
of
the
rail
to
the
front
of
the
rack
with
one
M6
×
10
screw
and
one
clip
nut
(see
1
in
1
2
3
Front
Rear
svc00033
Figure
26.
Adjusting
the
rail
depth
on
the
2145
UPS-1U
1
2
svc00034
Figure
27.
Securing
the
rear
rail
on
the
2145
UPS-1U
Chapter
4.
Installing
the
UPS,
the
master
console,
and
the
SAN
Volume
Controller
51
Summary of Contents for 2145-4F2
Page 1: ...IBM System Storage SAN Volume Controller Installation Guide V ersion 4 1 0 GC26 7900 00...
Page 2: ......
Page 3: ...IBM System Storage SAN Volume Controller Installation Guide V ersion 4 1 0 GC26 7900 00...
Page 8: ...vi IBM System Storage SAN Volume Controller Installation Guide...
Page 74: ...44 IBM System Storage SAN Volume Controller Installation Guide...
Page 78: ...48 IBM System Storage SAN Volume Controller Installation Guide...
Page 120: ...90 IBM System Storage SAN Volume Controller Installation Guide...
Page 122: ...92 IBM System Storage SAN Volume Controller Installation Guide...
Page 128: ...98 IBM System Storage SAN Volume Controller Installation Guide...
Page 134: ...104 IBM System Storage SAN Volume Controller Installation Guide...
Page 138: ...108 IBM System Storage SAN Volume Controller Installation Guide...
Page 141: ......
Page 142: ...Part Number 31P0797 Printed in USA GC26 7900 00 1P P N 31P0797...
Page 143: ...Spine information IBM System Storage SAN Volume Controller Installation Guide Version 4 1 0...