Figure 29
Approved PVC Side Wall Termination configuration
3.7.7 Indoor air combustion air intake
An “Indoor Combustion Air installation” can be described as air for combustion that is taken from the
air surrounding the boiler.
Warning
When using indoor air options, supply adequate combustion air to the boiler room
according to the requirements of all applicable codes.
Flue gas exhaust to outdoors
Combustion air from boiler room. For indoor air installation, check air intake and boiler
room combustion air opening(s) to ensure they are clear of obstructions.
Figure 30
Indoor combustion air intake
35
3.7.7 Indoor air combustion air intake
Summary of Contents for VX Series
Page 8: ...Intentionally left empty...
Page 14: ...Intentionally left empty...
Page 52: ...Figure 36 Two pump two load parallel piping concept 48 Section Installation...
Page 74: ...Intentionally left empty...
Page 100: ...Intentionally left empty...
Page 101: ...97 Appendices Wiring diagrams Figure 48 Controller electrical diagram...
Page 102: ...Figure 49 Internal wiring diagram 98 Section Appendices...
Page 103: ...Figure 50 Sequence of Operation 99 Appendices...
Page 106: ...102 Section Appendices...