6.3.3.2 Performing a combustion test and adjustment
The High Fire (gas-air ratio) adjustment screw will have to be adjusted to attain optimum
combustion results whenever fuel conversion is undertaken, however, no mixture adjustment must
be performed unless done by a qualified technician using properly functioning and calibrated
combustion analyzing equipment.
1. Turn on the boiler’s external gas shut-off valve.
2. Give the boiler a call for heat.
3. To run the boiler at high fire, you can set the heat-out value in Test Operation mode to the
maximum MBH for the boiler. To do this, on the controller, go to
>
Test Operation
> In
the
Fan Test: Heat Out
field, tap
0 MBtu
, then enter the maximum MBH.
When the boiler reaches high fire, insert the combustion analyzer test probe into the flue gas
test port. Then verify that the CO
2
reading is within the combustion test targets at
values.
Figure 44
Flue gas test port
4. Adjust the high fire according to values in
using a Torx 15 screwdriver. Turn the
screwdriver clockwise no more than a maximum of one full rotation at a time to raise the
CO
2
% (to richen). Turn counter-clockwise no more than a maximum of one full rotation at a
time to lower CO
2
%.
5. Set the heat-out value in Test Operation mode to the minimum MBH for the boiler. To do this,
go to
>
Test Operation
> In the
Fan Test: Heat Out
field, tap
0 MBtu
, then enter the
minimum MBH.
6. Adjust the low fire according to values in
using a Torx 15 screwdriver. Turn the
screwdriver clockwise to raise the CO
2
% (to richen). Turn counter-clockwise to lower
CO
2
%. Start with ⅛ of a turn until you see the analyzer measure a change then only make
1/16 adjustments. If changing direction on this adjustment you may notice a significant
backlash.
67
6.3.3 Adjusting the gas valve
Summary of Contents for VX Series
Page 8: ...Intentionally left empty...
Page 14: ...Intentionally left empty...
Page 52: ...Figure 36 Two pump two load parallel piping concept 48 Section Installation...
Page 74: ...Intentionally left empty...
Page 100: ...Intentionally left empty...
Page 101: ...97 Appendices Wiring diagrams Figure 48 Controller electrical diagram...
Page 102: ...Figure 49 Internal wiring diagram 98 Section Appendices...
Page 103: ...Figure 50 Sequence of Operation 99 Appendices...
Page 106: ...102 Section Appendices...