5.
Ensure that the trap upper union nut is
secured by the outlet clip.
6.
Check that all trap fittings have been
hand-tightened to prevent leakage of flue
gases. Do not use tools and over-torque.
Check for leaks.
3.10 Installing a condensate neutralizer
If discharging condensate into building drain piping materials that are subject to corrosion, use a
neutralization package.
Caution
After installing a condensate neutralization package, the pH of the condensate discharge
must be measured on a regular schedule to ensure the neutralizing agent is active and
effective.
Danger
The water in the condensate neutralizer can cause severe burns to the skin. Wear
protective gloves and eye wear when servicing the condensate neutralizer.
39
3.10 Installing a condensate neutralizer
Summary of Contents for VX Series
Page 8: ...Intentionally left empty...
Page 14: ...Intentionally left empty...
Page 52: ...Figure 36 Two pump two load parallel piping concept 48 Section Installation...
Page 74: ...Intentionally left empty...
Page 100: ...Intentionally left empty...
Page 101: ...97 Appendices Wiring diagrams Figure 48 Controller electrical diagram...
Page 102: ...Figure 49 Internal wiring diagram 98 Section Appendices...
Page 103: ...Figure 50 Sequence of Operation 99 Appendices...
Page 106: ...102 Section Appendices...