background image

AS0715-E

Page 

10

Programming

General Information

The control valve is designed to initiate regeneration
according to pre-set factory parameters. Following
the instructions contained in this section will allow
the installer to customise the program for the users
exact needs.

The regeneration cycle is controlled by the time cam
located on the front of the timer assembly. The brine
& slow rinse cycle can be adjusted from 50 minutes
to 95 minutes in 5 minute increments. The backwash
and fast rinse cycles are not adjustable.

Factory Default Settings

The following default cycle settings are preset into
the control valve.

Cycles:

Backwash

11 1/2 minutes

Brine / Slow Rinse

70 minutes

Fast Rinse

4 1/2 minutes

Set Time of Regeneration

1.  Remove the front dust cover from the timer

assembly.

2.  Rotate the Time of Regeneration plate (A) until

the desired time appears in the window. Note
A.M. or P.M.

Set Time of Day

1.  Remove the front dust cover from the timer

assembly.

2.  Turn the Timer Knob (B) until the alignment

mark located on the Time of Day Gear (C)
points directly to the correct time of day. Note
A.M. or P.M.

Set Regeneration Frequency

1.  Remove the front dust cover from the timer

assembly.

2.  Pull all skipper wheel tabs up.
3.  Rotate skipper wheel (D) until the number one

tab aligns with the DAY mark (E)

4.  Starting with the number one tab, push down the

tabs to determine the days on which
regeneration is required.

Regeneration Cycles

The backwash and fast rinse cycles are non-
adjustable. Adjusting the brine and slow rinse cycle
can be accessed according to the following
procedure:

1.  Loosen the screw located on top of the timer

cover, remove front dust cover from timer
assembly.

2.  Turn Timer Knob (B) until setscrew on the time

cam is visible.

3.  Loosen setscrew, and using the alignment mark

(F) located on the lower cam, move timing cam
to the desired length of time.

4.  Tighten setscrew and install dust cover.

Summary of Contents for 500 series

Page 1: ...OPERATING INSTRUCTIONS Model AS0715 E Serial No Telephone 07 3219 2233 Facsimile 07 3219 2266 Email sales ibcwater com au Website www ibcwater com au FILTRATION WATER TREATMENT PRODUCTS for commercial...

Page 2: ...imately 20ppm based on a sample volume of 10mls Other hardness test kits are available for more accurate testing eg Hardness Tablets Directions Take a 50ml sample of water in a screw capped bottle Add...

Page 3: ...ms call C 3 Daily Water Usage in litres call D For household situations allow 250 litres per person per day CALCULATION N 1000 x C D x H Select nearest lower whole number If necessary consult your dea...

Page 4: ...e system pressure must be between 140 kPa and 690 kPa psi 5 If the system pressure is greater than 690kPa psi a pressure reducing valve must be installed 6 The unit must be installed in accordance wit...

Page 5: ...Again turn knob B counter clockwise until cam follower G has fully depressed drain valve stem H Water will run from drain line and water in the salt storage tank will be lowered approximately to the...

Page 6: ...enerations select tabs 1 3 5 7 9 11 From the left column locate the number in the family reading along and down from the hardness column where the column intersect gives the number of regenerations fo...

Page 7: ...AS0715 E Page 7...

Page 8: ...AS0715 E Page 8 Water Conditioning Control System Installation Operating and Maintenance Manual 541 030 VALVE...

Page 9: ...repare the resin bed for brining In brine draw concentrated salt brine is drawn from the brine tank and directed to flow down through the riser tube and up through the resin bed to the drain Brine is...

Page 10: ...e appears in the window Note A M or P M Set Time of Day 1 Remove the front dust cover from the timer assembly 2 Turn the Timer Knob B until the alignment mark located on the Time of Day Gear C points...

Page 11: ...15 87 Screw Head Mount 4 15 529 239 1 Cycle Cam Knob Assembly 1 16 529 219 3 Drain Plunger Assembly 1 17 401 7 return Spring Drain Plunger 1 18 185 0221 1 O ring Plunger Cap 1 19 529 286 Plunger Cap 1...

Page 12: ...AS0715 E Page 12...

Page 13: ...1 19 186 111 N O ring Brine Fitting 1 20 541 250 1 Brine Fitting 1 21 19 19 C Clip Backwash Flow Adjuster 1 22 541 243 Backwash Flow Adjuster w o rings 1 23 529 244 Gasket Cross Over Port 1 24 541 244...

Page 14: ...AS0715 E Page 14...

Page 15: ...ently c Faulty safety float a Verify that the safety float is properly set b Check regeneration frequency c Replace safety float 4 Loss of resin a Faulty air check in storage tank b Leak at the distri...

Page 16: ...he timer assembly 6 Follow these steps in reverse to reinstall the timer assembly Main Diaphragm Replacement 1 Disconnect all electrical power to the control 2 Place the bypass valve into the bypass p...

Page 17: ...wer to the control 2 Place the bypass valve into the bypass position 3 Relieve system pressure 4 Disconnect the solenoid cable from the solenoid coil 5 Remove the four 4 screws from the backcap 6 Plac...

Page 18: ...Lightly lubricate the o rings with a Dow 111 Silicone based lubricant 11 Follow these steps in reverse to re install the backwash adjustment valve Solenoid Assembly Replacement 1 Disconnect all elect...

Page 19: ...r Cabinet Model Float Distance X AS0715 E 100mm AS0922 E 200mm AS1029 E 260mm Adjustment of Softener Brine Valve 1 Lift float rod to full up position 2 Set float to distance shown Measure from the top...

Reviews: