I&J4000-LF Series Operating Manual
Section 9: Maintenance and Periodic Inspection
Part # 562187
Rev. E - Jan. 08
- Page 119 -
© 2008 I&J Fisnar Inc.
Check point Check action (See if) Corrective action
Overhaul - Diagnose the whole system and - Contact Agent
take decisions for the overhaul
2. Greasing Procedure
2.1 Grease Type and Greasing Interval
•
Grease type: 30 – 100 centistokes (recommended: THK AFA 70G)
•
Greasing period: every 6 months
2.2 Accessing Parts to be Greased
1. Unscrew the bolts shown with arrows in the following pictures
and remove the covers.
2. Apply grease thinly to the surfaces of ball screw assembly shaft,
LM guide and slide guide.
3. Put back the covers and screw in the bolts.
Summary of Contents for I&J4000-LF Series
Page 130: ......