7.1 Troubleshooting confirmations
7-3
7.
Troubleshooting
(3) Check for abnormality in the master device (PLC, etc.)
(4) Check the voltage of the main power supply (24VDC)
Check for momentary power failure, voltage drop, power failure, etc.
(5) Confirm the generated alarm
Check the alarm information with the teaching tool.
(6) Check the connectors for disconnection or incomplete connection
(7) Check the cables for connection error, disconnection or snagging
Cut off the main power supply of the equipment (to avoid electric shock) and remove the
cables around the measurement point (to avoid conductivity through the surrounding
circuit) before checking the conductivity.
(8) Check the I/O signals
Use the master device and ELECYLINDER teaching tool to check for inconsistency or
abnormality in the input/output signal status of the two units.
(9) Check the noise elimination measures (grounding, connection of noise
suppressor, etc.)
(10) Check the events leading to the occurrence of the problem, as well as the
operating conditions at the time of occurrence
(11) Analyze the cause
(12) Countermeasures
Caution
When troubleshooting, exclude normally functioning parts from the targets
to narrow down the causes.
First, check (1) to (10) so that countermeasures can be taken swiftly.
Summary of Contents for EC-ST15
Page 2: ......
Page 26: ...Intro 18 ...
Page 28: ......
Page 44: ......
Page 60: ...2 16 2 Installation ...
Page 62: ......
Page 82: ...3 20 3 Wiring ...
Page 106: ......
Page 112: ...5 6 5 Preventive Predictive Maintenance ...
Page 114: ......
Page 128: ...6 14 6 Parameters ...
Page 130: ......
Page 148: ...7 18 7 Troubleshooting ...
Page 150: ......
Page 190: ...8 40 8 Maintenance and Inspection ...
Page 192: ......
Page 194: ...9 2 9 External Dimensions ...
Page 196: ......
Page 198: ...10 2 10 Life ...
Page 200: ......
Page 203: ...Appendix 12 1 Index 12 1 12 2 Revision history 12 4 ELECYLINDER Chapter12 ...
Page 204: ......
Page 209: ......