background image

9

 

2.  While the Top (2) and Upper Headboard (3) are 

    clamped in place, drill and countersink (if desired) 

    pilot holes for #8 x 2" Screws (not included). 

Fig. 2.

 

3.  Release the clamps to separate the parts. Use a 

    doweling jig and 3/8" drill bit to bore 3/8" x 5/8" 

    deep holes in the inside face of the Top (2) and 

    3/8" x 1" deep holes in the top edge of the Upper 

    Headboard (3). You will join these pieces with 

    3/8" x 1

1

2

" dowels and wood glue (not included). 

  

Fig. 2.

 

4.  Repeat Steps 6-8 for the Bottom (2) and Lower 

    Headboard (4), drilling for dowels and screws 

    at the same intervals. 

Fig. 2.

Recommended Cabinet  

Assembly (Parts Not Included)

Fig. 2 - Top and Upper Headboard/Bottom and Lower Headboard Assemblies

Side View

Front View

Front View

Side View

3

4

2

2

4

2

3

2

Screws

Dowel Rods

 

1.  Place the Top (2) on a work surface so that its inside 

    face is oriented up. Position the Upper Headboard (3) 

    on edge on the inside face of the Top (2) so the 

    pieces form an “L.” Clamp in place and mark locations 

    for three joint-reinforcing dowels across the back 

    edge of the Top (2) and back face of the Upper 

    Headboard (3). Also mark drilling locations for four 

    screws on the top face of the Top (2). 

Fig. 2.

>

  Failure to use appropriate fasteners and 

  construction practices could undermine the 

  structural integrity of your cabinet, potentially 

  leading to cabinet failure and serious injury.

>

   Do  NOT use an impact driver to drive fasteners; 

  the added torque of an impact driver increases 

  the risk of stripping the pilot holes and weakening 

  connections. Do NOT overtighten screws.

Summary of Contents for REVISED VERTICAL MURPHY BED

Page 1: ...Y BED HARDWARE KIT INSTRUCTIONS Revised November 2017 Review instructions fully prior to use for important safety information Always check Rockler com to confirm that you are using the most recent ver...

Page 2: ...use this product if you are in any way impaired by medications alcohol drugs or fatigue Dress appropriately and remove all jewelry secure loose clothing and tie up long hair before using this tools to...

Page 3: ...for vertical Twin and vertical Full beds MUST be secured using all required hardware to at least two 2 wall studs cabinets for vertical Queen beds wall beds MUST be secured to at least three 3 wall s...

Page 4: ...pport 1 1 1 E Upper and Lower Frame Supports 2 2 2 F Flat Bars 2 2 2 G1 Pistons 2 2 2 H Mattress Supports 1 2 2 I Mounting Plate Left and Right 2 2 2 J Saddle Locking Plates 2 2 2 L Door Brackets 6 12...

Page 5: ...mm Machine Screw 2 2 2 AA M6 x 30mm Bolts 4 4 4 BB M8 x 50mm Bolts 34 34 34 DD Nylon Washers for Legs 4 4 4 EE M5 Nuts for Saddle Lock 2 2 2 FF M8 Lock Nuts 40 40 40 GG Temporary Stop styrofoam 2 2 2...

Page 6: ...anent Stop 5 8 x 3 x 18 1 QUEEN BED Mattress Size 60 X 80 X 10 Dimensions T x W x L Quantity 1 Sides 3 4 x 17 x 791 8 2 2 Top and Bottom 3 4 x 17 x 571 4 2 3 Upper Headboard 3 4 x 13 x 571 4 1 4 Lower...

Page 7: ...TOOLS NOT INCLUDED REQUIRED HARDWARE NOT INCLUDED Stud Finder Wood Glue Phillips Screwdriver 3 16 Drill Bit Circular Saw or Table Saw 3 8 x 11 2 Dowels 3 8 Nut Driver or Socket Wrench 5 16 Drill Bit...

Page 8: ...steners to fail potentially resulting in serious personal injury Fig 1 27 64 diameter x 9 16 deep pilot hole U I T 1 21 2 21 2 79 16 61 4 117 16 31 8 97 16 615 16 Right Cabinet Side 117 16 137 8 1711...

Page 9: ...board Assemblies Side View Front View Front View Side View 3 4 2 2 4 2 3 2 Screws Dowel Rods 1 Place the Top 2 on a work surface so that its inside face is oriented up Position the Upper Headboard 3 o...

Page 10: ...oard Fig 3 9 Move to the bottom of the right Side 1 and mark locations for two dowels across the bottom edge of the right Side and bottom face of the Bottom 2 Mark drilling locations for three screws...

Page 11: ...hem Cabinets for Twin and Full beds MUST be secured using all required hardware to at least two 2 wall studs cabinets for Queen beds MUST be secured to at least three 3 wall studs All 1 4 x 3 Washer H...

Page 12: ...r the 1 4 x 3 Washer Head Lag Bolts KK Remember each Wall Bracket HH MUST attach to the wall with TWO lag bolts Fig 7 Do NOT use an impact driver to drive fasteners the added torque of an impact drive...

Page 13: ...x 50mm bolts BB and M8 Lock Nuts FF 5 Position the Long Center Frame Support assembly between the two side frame assemblies making sure that all tabs are at the bottom Make sure that the metal tabs p...

Page 14: ...and Double Slat Cap Q into the corresponding mounting holes in the frame You might need to bend the Slats slightly and use a rubber mallet to tap the Slat Caps and Double Slat Cap into place Fig 8 4 R...

Page 15: ...11 Tighten the Screw fully 4 Carefully tilt the frame upward past the front edge of the cabinet and hold it there Fig 12 On each side fit the end of the Piston G1 onto the threaded stud on the Mountin...

Page 16: ...s not included Fig 14 7 With the Temporary Stops GG still holding the top of the frame out from the cabinet fit a Nylon Washer DD onto the threaded stem of the left Leg M and fit the threaded stem int...

Page 17: ...not included to the front face of your Door Panel s 5 at a height that will allow you to comfortably pull down the bed About one third of the way down from the top of the door is a good rule of thumb...

Page 18: ...tracted and the bed is lowered beyond the normal horizontal position If they do then you MUST either fine tune the position of the Door Panels on the frame or the Door Panels width MUST be reduced 4 H...

Page 19: ...19 Fig 19 Fig 20 P O Q O P H...

Page 20: ...e Door Panels slowly and carefully allow the bed to tilt up into the cabinet 1 Once the bed unit has been assembled correctly and secured to the wall pull the bed down and while holding the frame secu...

Reviews: