16
Fig. 14
Fig. 15
5. Pull the top of the bed frame out beyond the front of
the cabinet and install the Temporary Stops (GG) on
the top corners of the cabinet.
Fig. 14.
6. Position the Permanent Stop (6) where you want to
install it. Make sure that it’s centered and set back
from the front edge far enough that the frame will be
plumb when closed. Drill pilot holes and secure with
three #8 x 1
1
⁄
4
" screws (not included).
Fig. 14.
7. With the Temporary Stops (GG) still holding the
top of the frame out from the cabinet, fit a Nylon
Washer (DD) onto the threaded stem of the left
Leg (M) and fit the threaded stem into its hole in the
frame. Fit another Nylon Washer onto the stem and
secure with an M8 Lock Nut (FF). Do not
overtighten, or the leg might not pivot correctly.
Fig. 15.
8. Repeat Step 7 for the right Leg (M).
9. Attach the Leg Tube (N) to the Legs (N) with four
M6 x 30mm Screws (AA), driven with #4 Allen
Key (NN). Drive the Screws through the Legs into
tapped holes in the Leg Tube.
Fig. 15.
GG
GG
6
M
AA
N
DD
DD
FF
Summary of Contents for REVISED VERTICAL MURPHY BED
Page 19: ...19 Fig 19 Fig 20 P O Q O P H...