4-25
11. RCV LEVER OPERATING PATTERN
Terminal block
LH
Mounting bolt(92)
Nut(20)
90 (Lever only)
C Type
4
P
2
T
LH
H
F
J
G
D
A
E
B
2
1
4
P
3
2
T
1
RH
1
3
11074OP40
Whenever a change is made
to the machine control
pattern also exchange the
pattern label in the cab to
match the new pattern.
Pattern
ISO Type
Hyundai
A Type
B Type
C Type
Left
Left
Right
Left
Right
Left
Right
Left
Right
Right
Control function
Arm out
Arm in
Swing right
Swing left
Boom lower
Boom raise
Bucket out
Bucket in
Boom lower
Boom raise
Swing right
Swing left
Arm out
Arm in
Bucket out
Bucket in
Boom lower
Boom raise
Bucket in
Bucket out
Arm out
Arm in
Swing right
Swing left
Hose connection(Port)
RCV
lever
D
E
A
B
J
H
F
G
D
E
A
B
J
H
F
G
D
E
A
B
J
H
F
G
-
-
-
-
-
-
-
-
J
H
-
-
D
E
-
-
J
H
G
F
D
E
A
B
Change of MCV port
From
To
Operation
Loosen the RCV lever mounting bolt(21) and rotates
lever assy 90 counterclockwise; then install.
To put lever in correct position, disassemble nut(20)
and rotates only lever 90 clockwise.
Same as ISO type