Changzhou ITC Power Equipment Manufacturing Co.,Ltd.
Changzhou ITC Power Equipment Manufacturing Co.,Ltd.
Changzhou ITC Power Equipment Manufacturing Co.,Ltd.
Changzhou ITC Power Equipment Manufacturing Co.,Ltd.
Changzhou ITC Power Equipment Manufacturing Co.,Ltd.
20
POWER PRODUCTS
Connecting Rod Nut Torque Value
38-42 N.m
3.2. 5 Camshaft and balance shaft
(1) Insert the tappets.
(2) Insert the cam shaft.
(3) Insert the balance shaft.
·Do not confuse the intake and exhaust tappets.
·Check whether the matching marks of gear are aligned correctly.
3.2.6 Crankcase cover
(1) Place an aluminum washer between the surface of crankcase and the cover.
(2) Reassemble the crankcase cover (Tighten bolts in a diagonal sequence)
·To protect the oil seal, attach a jig for inserting the oil seal to the shaft prior to
insertion.
·Apply grease to the oil seal lips.
·Make sure that the engine oil pump drive gears are properly engaged.