
Changzhou ITC Power Equipment Manufacturing Co.,Ltd.
Changzhou ITC Power Equipment Manufacturing Co.,Ltd.
Changzhou ITC Power Equipment Manufacturing Co.,Ltd.
Changzhou ITC Power Equipment Manufacturing Co.,Ltd.
Changzhou ITC Power Equipment Manufacturing Co.,Ltd.
POWER PRODUCTS
26
(2) Wind the starter rope around the reel as per figure (g). Take the rope from the gap
after two ½ revolutions and engage the spring’s inner end with the reel’s hook.
Place the reel into the case.
(3) Hold the starter rope as shown in figure (h). Securely hold the reel so that the
rope cannot reverse and wind the starter rope 4 revolutions in the arrow
direction shown in figure (h). Cross the rope from the inside to outside. Run the
reel slowly in an opposite direction of the arrow.
(4) Reassemble the parts removed in figure (g) in the opposite order of disassembly.
Pull the return spring while assembling the friction plate then insert it into the
holes of friction plate respectively as figure (h), (i).
Run the friction plate in the direction of the arrow. When the bulge in the ratchet
wheel is aligned with the ratchet guide, press the friction plate into the starter
reel. Assemble the lock pin and nut.